Agenda/Minutes of the VIS Meeting on 2016/9/30
2016/9/30 13:30 -
Participants:
Progress report
Type-A (Takahashi)
- Pre-isolator: Pre-isolators will be assembled in ATC. IP+TF will be transported from Akeno on 3rd October.
- EQ stop, release sensor, dummy payload: Production is on going. Met with the company person on 16th.
- Bottom Filter: Assembly of the second BF is on going.
- BF damper: Made the specification document with the drawings. Asking a quotation to a company. Actuator efficiency of LVDT prototype was measured.
- Maraging wire: New design around head was shown by ATC. Tensile test is in preparation.
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Inspection report of the GAS blade from Virgo (Takahashi)
- Maraging and SUS rod issue follow up.
- Which rods to be re-made ? (Takahashi)
- Type-A rod neck diameter
- IM OSEM noise issue (Shoda)
Site work plan for the next week
- Mon: BS test hanging
- Tue: BS test hanging
- Wed: BS test hanging
- Thu: BS test hanging
- Fri: BS test hanging
Travel Plans
- Travel (Week of 10/3):
- Takahashi: 3(Akeno)
- Shoda:
- Mark: 3-7
- Fabian: 3-7
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato: 3(Akeno)
- Ohishi:
- Travel (Week of 10/10):
- Takahashi: 11 -14 (Extended Chief Meeting/Accelerator check)
- Shoda:
- Mark: 11-14
- Fabian: 11-14
- Okutomi: 11 -14 (Extended Chief Meeting/Accelerator check/FE code development)
- Fujii:
- Ishizaki:
- Hirata:
- Sato: 11 -14 (Extended Chief Meeting/Accelerator check)
- Ohishi:
Next meeting
2016/10/7(Fri) 13:30 -