Line 13: | Line 13: |
* BF damper: Asking a quotation to a company. The test report of LVDT prototype was uploaded. [[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0057/T1605707/001/BFLVDTtest_report20160920v1.pdf|results]] | * BF damper: Asking a quotation to a company. The test report of LVDT prototype was uploaded ([[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0057/T1605707/001/BFLVDTtest_report20160920v1.pdf|report]]). |
Agenda/Minutes of the VIS Meeting on 2016/10/7
2016/10/7 13:30 -
Participants:
Progress report
Type-A (Takahashi)
- Pre-isolator: IPs and TFs were transported from Akeno to Mitaka on 3rd. One set of IP and TF wrer brought in the clean room.
- EQ stop, release sensor, dummy payload: Production is on going.
- Bottom Filter: Assembly of the second BF is on going. SUS bearings were ordered.
BF damper: Asking a quotation to a company. The test report of LVDT prototype was uploaded (report).
- Maraging wire: We concluded that the load to the maraging wires during crane operation is small enough to keep less than 2G.
Type B (Mark)
- Put a report here.
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Maraging and SUS rod issue follow up.
- Type-A installation procedure (Takahashi)
- Decision on the safety margin
- IM OSEM noise issue (Shoda)
Site work plan for the next week
- Mon: Holiday
- Tue: BS test hanging/Extended Chief Meeting
- Wed: BS test hanging
- Thu: BS test hanging
- Fri: BS test hanging
Travel Plans
- Travel (Week of 10/10):
- Takahashi: 11 -14 (Extended Chief Meeting/Accelerator check)
- Shoda:
- Mark: 10-14
- Fabian: 11-14
- Okutomi: 12 -14 (Extended Chief Meeting/Accelerator check/FE code development)
- Fujii:
- Ishizaki:
- Hirata:
- Sato: 12 -14 (Extended Chief Meeting/Accelerator check)
- Ohishi:
- Travel (Week of 10/17):
- Takahashi:
- Shoda:
- Mark: 17-21
- Fabian: 17-21
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Next meeting
2016/10/14(Fri) 13:30 - VIS F2F: Oct. 28, Nov. 18, Dec. 2