Progress report
Type-A (Takahashi)
- Pre-isolator: IPs and TFs were transported from Akeno to Mitaka on 3rd. One set of IP and TF were brought in the clean room.
- Top filter was found damaged: a screw came out apparently from the vibration during the transportation.
- We don't know when this happened. We will check the screws before transporting the remaining TFs from Akeno to Mitaka.
- Spare parts to fix the broken part are available.
- EQ stop, release sensor, dummy payload: Production is on going.
- Bottom Filter: Assembly of the second BF is on going. SUS bearings were ordered.
BF damper: Asking a quotation to a company. The test report of LVDT prototype was uploaded (report).
- Maraging wire: We concluded that the load to the maraging wires during crane operation is small enough to keep less than 2G.
Type B (Mark)
- Type B Past Week Summary
- Fabian, Mark and Liu-kun did BS installation at Kamioka:
- Connected the DIO card to the LPCD. (Simulink model changes will be needed to make use of it.)
- Took TF data from the TM-H1 coil output to the voltage and current monitors and found that the response was approximately flat, meaning that meaningful TFs can be taken of the RM/BS stage with no DIO.
- Used the 90° prism and the optical lever to set the pitch of the RM to match the dummy BS.
- Removed the RM trolley and added the bottom section of the security structure.
- Lifted the IM/RM/BS with the load gauge adapter and load gauge and measured its mass.
- Hirata-san:
- Mark checked lots of drawings by Hirata-san.
- Mark worked on schedule but only succeeded in completely garbling the Type B section of the VIS schedule on the server.
- Fabian, Mark and Liu-kun did BS installation at Kamioka:
- Longer term to-do list
- Do Inventor assembly for SRx in chamber and on assembly frame (Hirata) - SR2/SR3 DONE, SRM ongoing.
- Part "disk security" top has to be modified - screw positions do not match.
- Write more of payload assembly procedure (Fabian) - ONGOING
Write more of BS Assembly Procedure E1504235, E1504235 draft (Mark) - ONGOING
- Lower breadboard installation to be incorporated into the procedure document.
- Work on BS simulation (Fabian)
- Do BS Simulink model (Mark, Kokeyama) - TM/IM/BF level DONE
- Do 2D drawings of SR2 parts (Hirata)
- Redesign SRx IM wire clamps for larger prisms, remachined RMs
- Order SRM/PRM parts (Hirata/Shoda)
- Order SRx fasteners (Hirata)
- Do Inventor assembly for SRx in chamber and on assembly frame (Hirata) - SR2/SR3 DONE, SRM ongoing.
Type-Bp (Shoda)
- Modification Parts
- I asked the ICRR desk to make an announcement for the open estimation. The call for cost estimation is announced today.
- The result will be open on the beggining of the November.
- The delivery date of the whole the parts will be in January. But I asked the possible companies to give us 1 set earlier. (I heard that it would be possible within this year.)
- Mirapro
- Hirata-san updated the wire design and hook design. Some other parts only used for Type-Bp should be also updated.
- How to order is under discussion.
- BFRM wires
- Takahashi-san will make an order soon.
- Mirror preparasion
- Discussion about the jigs for removing the current flags from the PR3 and spare mirrors are ongoing with Hirose-san. (No progress this week.)
- Flags
- Hirata-san made the models. Checked and ordered soon.
IMMT (Ohishi)
- No progress this week.
Watchdog system (Tanaka)
- Finished the schematic design. Start working on the PCB design.
Safety
- No issue.
Discussion
- Maraging and SUS rod issue follow up.
- Type-B Maraging rods: design is ready. Will be ordered soon (Takahashi)
- SUS rods: design is ready. Will be ordered with the PR assembly frame (Takahashi/Shoda)
- Type-A Maraging rods
- Installation procedure review concluded that the rods will not get tension above the static load during installation.
- We employ the safety factor of 2 as requirement.
- Takahashi will explain this and ask Obuchi-san to re-optimize the shape after the meeting.
- Neck diameter can be increased to keep the safety margin
We want to keep the nail head diameter <= 8mm as much as possible.
- Takahashi will ask Ojima whether 9mm nail head is possible or not just in case we need to increase the nail head size.
- IM OSEM noise issue (Shoda)
- We need to tune the filters for length and yaw to reduce the noise coupling.
Site work plan for the next week
- Mon: Holiday
- Tue: BS test hanging/Extended Chief Meeting
- Wed: BS test hanging/Accelerometer test
- Thu: BS test hanging/Accelerometer test
- Fri: BS test hanging/Accelerometer test
Travel Plans
- Travel (Week of 10/10):
- Takahashi: 11 -14 (Extended Chief Meeting/Accelerator check)
- Shoda:
- Mark: 10-14
- Fabian: 11-14
- Okutomi: 13 -14 (Extended Chief Meeting/Accelerator check/FE code development)
- Fujii:
- Ishizaki:
- Hirata:
- Sato: 12 -14 (Extended Chief Meeting/Accelerator check)
- Ohishi:
- Travel (Week of 10/17):
- Takahashi:
- Shoda:
- Mark: 17-21
- Fabian: 17-21
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Next meeting
2016/10/14(Fri) 13:30 - VIS F2F: Oct. 28, Nov. 18, Dec. 2