Size: 2279
Comment:
|
Size: 2236
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
* Put a report here | * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]] * Pre-isolator: The sensitivity measurement of ACC is on going at the site. * EQ stop, release sensor, dummy payload: Production is on going. * Bottom Filter: Assembly of the second BF was finished. SUS bearings were delivered. * BF damper: The bidding was announced on 14th. Open bidding is on 9th November. * Maraging wire: We asked Obuchi-san redesign of the wire for Type-A with safety margin of 2. * Installation: Review on the installation procedure will be held on 4th November. |
Line 19: | Line 25: |
* Put a report here | * 2D/3D drawings *Uploaded slightly simplified step and dwg files to Dropbox (Subsystems/VIS/TypeC/). *Please notice that these still remain some small mistakes. * |
Line 30: | Line 39: |
* Type-B Maraging rods: design is ready. Will be ordered soon (Takahashi) * SUS rods: design is ready. Will be ordered with the PR assembly frame (Takahashi/Shoda) * Type-A Maraging rods * Installation procedure review concluded that the rods will not get tension above the static load during installation. * We employ the safety factor of 2 as requirement. * Takahashi will explain this and ask Obuchi-san to re-optimize the shape after the meeting. * Neck diameter can be increased to keep the safety margin * We want to keep the nail head diameter <= 8mm as much as possible. * Takahashi will ask Ojima whether 9mm nail head is possible or not just in case we need to increase the nail head size. |
* Order status: Type-B Maraging rods, SUS rods * Type-A Maraging rod re-optimization status (Takahashi) * Nail head diameter 9mm (possible ?) |
Line 43: | Line 44: |
* Mon: BS test * Tue: BS test hanging/Extended Chief Meeting * Wed: BS test hanging/Accelerometer test * Thu: BS test hanging/Accelerometer test * Fri: BS test hanging/Accelerometer test |
* Mon: BS test hanging * Tue: BS test hanging * Wed: BS test hanging * Thu: BS test hanging * Fri: BS test hanging |
Line 50: | Line 51: |
* Travel (Week of 10/10): * Takahashi: 11 -14 (Extended Chief Meeting/Accelerator check) * Shoda: * Mark: 10-14 * Fabian: 11-14 * Okutomi: 13 -14 (Extended Chief Meeting/Accelerator check/FE code development) * Fujii: * Ishizaki: * Hirata: * Sato: 12 -14 (Extended Chief Meeting/Accelerator check) * Ohishi: |
|
Line 77: | Line 63: |
* Travel (Week of 10/24): * Takahashi: * Shoda: * Mark: 24-27 (BS) * Fabian: 24-27 (BS) * Okutomi: 24-27 (PI realtime model development) * Fujii: * Ishizaki: * Hirata: * Sato: * Ohishi: |
|
Line 78: | Line 78: |
2016/10/14(Fri) 13:30 - | 2016/10/21(Fri) 13:30 - |
Agenda/Minutes of the VIS Meeting on 2016/10/14
2016/10/14 13:30 -
Participants:
Progress report
Type-A (Takahashi)
- Pre-isolator: The sensitivity measurement of ACC is on going at the site.
- EQ stop, release sensor, dummy payload: Production is on going.
- Bottom Filter: Assembly of the second BF was finished. SUS bearings were delivered.
- BF damper: The bidding was announced on 14th. Open bidding is on 9th November.
- Maraging wire: We asked Obuchi-san redesign of the wire for Type-A with safety margin of 2.
- Installation: Review on the installation procedure will be held on 4th November.
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- 2D/3D drawings
- Uploaded slightly simplified step and dwg files to Dropbox (Subsystems/VIS/TypeC/).
- Please notice that these still remain some small mistakes.
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Maraging and SUS rod issue follow up.
- Order status: Type-B Maraging rods, SUS rods
- Type-A Maraging rod re-optimization status (Takahashi)
- Nail head diameter 9mm (possible ?)
Site work plan for the next week
- Mon: BS test hanging
- Tue: BS test hanging
- Wed: BS test hanging
- Thu: BS test hanging
- Fri: BS test hanging
Travel Plans
- Travel (Week of 10/17):
- Takahashi:
- Shoda:
- Mark: 17-21
- Fabian: 17-21
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
- Travel (Week of 10/24):
- Takahashi:
- Shoda:
- Mark: 24-27 (BS)
- Fabian: 24-27 (BS)
- Okutomi: 24-27 (PI realtime model development)
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Next meeting
2016/10/21(Fri) 13:30 - VIS F2F: Oct. 28, Nov. 18, Dec. 2