Agenda/Minutes of the VIS Meeting on 2016/10/14

2016/10/14 13:30 -

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Put a report here

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • 2D/3D drawings
    • Uploaded slightly simplified step and dwg files to Dropbox (Subsystems/VIS/TypeC/). These are 2nd version files and remain some small mistakes.

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Any issue ?

Discussion

  • Maraging and SUS rod issue follow up.
    • Order status: Type-B Maraging rods, SUS rods
    • Type-A Maraging rod re-optimization status (Takahashi)
      • Nail head diameter 9mm (possible ?)

Site work plan for the next week

  • Mon: BS test hanging
  • Tue: BS test hanging
  • Wed: BS test hanging
  • Thu: BS test hanging
  • Fri: BS test hanging

Travel Plans

  • Travel (Week of 10/17):
    • Takahashi:
    • Shoda:
    • Mark: 17-21
    • Fabian: 17-21
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 10/24):
    • Takahashi:
    • Shoda:
    • Mark: 24-27 (BS)
    • Fabian: 24-27 (BS)
    • Okutomi: 24-27 (PI realtime model development)
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Next meeting

2016/10/21(Fri) 13:30 - VIS F2F: Oct. 28, Nov. 18, Dec. 2