Differences between revisions 1 and 17 (spanning 16 versions)
Revision 1 as of 2016-10-26 15:21:59
Size: 1613
Editor: YoichiAso
Comment:
Revision 17 as of 2016-10-28 15:30:48
Size: 4329
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Participants: Participants: Takahashi, Mark, Sato, Tanaka, Okutomi, Ishizaki, Aso, Enzo, Hirata, Akutsu, Shoda, Fujii, Raffaele
Line 12: Line 12:
 * Put a report here  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]]
 * Pre-isolator: The top filter was mounted onto the IP. The shaft screw of motor was not matching to the slider for fishing rod. New shafts were ordered.
 * EQ stop, release sensor, dummy payload: Production is on going.
 * BF damper: Open bidding is on 9th November.
 * Maraging wire: Hirata-san made 2D drawings. The wires will be ordered soon.
 * Installation: Making assembly drawings for the installation procedure document. The review is held on 4th November.
Line 15: Line 20:
 * Put a report here  * Type B Past Week Summary
  * Fabian, Mark and Liu-kun did BS installation at Kamioka:
   * Debugged the issue with the BF keystone being tilted enough to cause rubbing on the yoke for the magnets. It was solved by moving the yoke ≈1 mm taking advantage of the oversized holes.
   * Measured the height of the payload as a function of trim mass. The BF spring seems to have a slightly lower load capacity and a rather higher spring constant than when it was remeasured by Hirata-san.
   * Removed IM trim mass to set the average height of the keystone to the CAD value.
   * Moved IM trim mass around to set the pitch of the dummy BS and the roll of the IM.
   * Constructed the rest of the IRM around the IM.
  * Hirata-san
   * Prepared to get quotes for different types of "flying saucer" cable clamps (D1504530, D1605625, D1605734).
   * Finished BS assembly drawings (in-tank version) and sent to Saito-sensei).
   * Finished maraging rod 3D models and drawings (for Type A)
   * Modified top plate drawings for PRM inner frame.
Line 18: Line 34:
 * Put a report here  * BFRM
  * Still waiting for ordering process.

 * Stab Flags
  * Waiting for the cost estimation.

 * Assembly frame
  * Asking cost estimate. Also asking to upgrade the assembly frame in the end of November.

 * Install procedure
  * pictures how to install whole suspension chain into the chamber is circulated.
   We will ask the company about the accerelation of the crane, the chain block, and the lever block.
   According to their information, we will buy a chain block or a lever block and test them at Mitaka.

 * Flag removing jig.
  * The model is made by Shoda and approved by Hirose-san. Now the 2D drawing is being made.
Line 23: Line 55:
 * Put a report here  *Conference material PCB Design Draft version.(Oct 21th 2016)[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0057/E1605760/001/Project_WDS_PCB_Design_Ver_0th-161021.pdf|PDF]]
 *Design and preparation(investigation of procurement) for production.[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0057/E1605791/002/Project_WDS_H_W_Assignment_Design_Ver0_1-20161028-1.pdf|PDF]]
Line 26: Line 59:
 * Any issue ?  * No issue
Line 33: Line 66:
 * Type-Bp installation tool: Lever block or Chain block (Shoda)
Line 34: Line 69:
 * Mon: BS test hanging
 * Tue: BS test hanging
 * Wed: BS test hanging
 * Thu: BS test hanging
 * Fri: BS test hanging
 * Mon:
 * Tue:
 * Wed:
 * Thu:
 * Fri:
Line 43: Line 78:
  * Shoda:
  * Mark: 31-11/4 (BS)
  * Shoda: 
  * Mark:
Line 46: Line 81:
  * Okutomi: 31-11/4 (PI realtime model development)   * Okutomi:
Line 50: Line 85:
  * Sato: 31-11/4 (Accelerometer test)   * Sato:
Line 54: Line 89:
  * Takahashi: 7-8 (Extended chief meeting/Fire drill)
  * Shoda: 7-8 (Extended chief meeting/Fire drill)
  * Mark: 8? (Fire drill)
  * Takahashi: 7-9 (Extended chief meeting/Fire drill/Accelerometer test)
  * Shoda: 7-11 (Extended chief meeting/Fire drill/PR3 disassemble)
  * Mark: 8 - 11 (Fire drill/BS)
Line 58: Line 93:
  * Okutomi: 8? (Fire drill)
  * Fujii: 8? (Fire drill)
  * Ishizaki: 8? (Fire drill)
  * Hirata: 8? (Fire drill)
  * Sato: 8? (Fire drill)
  * Okutomi: 7 - 11 (Extended chief meeting/Fire drill/Accelerometer test/Realtime code)
  * Fujii: ? (Fire drill)
  * Ishizaki:
  * Hirata: 8 - 11 (Fire drill/BS)
  * Sato: 7-9 (Fire drill/Accelerometer test)
  * Enzo: 8-11 (PR3 disassembly)
Line 64: Line 100:


Line 71: Line 104:

Agenda/Minutes of the VIS Meeting on 2016/10/28

2016/10/28 13:30 - @Mitaka F2F.

Participants: Takahashi, Mark, Sato, Tanaka, Okutomi, Ishizaki, Aso, Enzo, Hirata, Akutsu, Shoda, Fujii, Raffaele

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Pre-isolator: The top filter was mounted onto the IP. The shaft screw of motor was not matching to the slider for fishing rod. New shafts were ordered.
  • EQ stop, release sensor, dummy payload: Production is on going.
  • BF damper: Open bidding is on 9th November.
  • Maraging wire: Hirata-san made 2D drawings. The wires will be ordered soon.
  • Installation: Making assembly drawings for the installation procedure document. The review is held on 4th November.

Type B (Mark)

  • Type B Past Week Summary
    • Fabian, Mark and Liu-kun did BS installation at Kamioka:
      • Debugged the issue with the BF keystone being tilted enough to cause rubbing on the yoke for the magnets. It was solved by moving the yoke ≈1 mm taking advantage of the oversized holes.
      • Measured the height of the payload as a function of trim mass. The BF spring seems to have a slightly lower load capacity and a rather higher spring constant than when it was remeasured by Hirata-san.
      • Removed IM trim mass to set the average height of the keystone to the CAD value.
      • Moved IM trim mass around to set the pitch of the dummy BS and the roll of the IM.
      • Constructed the rest of the IRM around the IM.
    • Hirata-san
      • Prepared to get quotes for different types of "flying saucer" cable clamps (D1504530, D1605625, D1605734).
      • Finished BS assembly drawings (in-tank version) and sent to Saito-sensei).
      • Finished maraging rod 3D models and drawings (for Type A)
      • Modified top plate drawings for PRM inner frame.

Type-Bp (Shoda)

  • BFRM
    • Still waiting for ordering process.
  • Stab Flags
    • Waiting for the cost estimation.
  • Assembly frame
    • Asking cost estimate. Also asking to upgrade the assembly frame in the end of November.
  • Install procedure
    • pictures how to install whole suspension chain into the chamber is circulated.
      • We will ask the company about the accerelation of the crane, the chain block, and the lever block. According to their information, we will buy a chain block or a lever block and test them at Mitaka.
  • Flag removing jig.
    • The model is made by Shoda and approved by Hirose-san. Now the 2D drawing is being made.

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Conference material PCB Design Draft version.(Oct 21th 2016)PDF

  • Design and preparation(investigation of procurement) for production.PDF

Safety

  • No issue

Discussion

  • Suspension naming convention (Okutomi)
  • Type-Bp installation tool: Lever block or Chain block (Shoda)

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 10/31):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 11/7):
    • Takahashi: 7-9 (Extended chief meeting/Fire drill/Accelerometer test)
    • Shoda: 7-11 (Extended chief meeting/Fire drill/PR3 disassemble)
    • Mark: 8 - 11 (Fire drill/BS)
    • Fabian:
    • Okutomi: 7 - 11 (Extended chief meeting/Fire drill/Accelerometer test/Realtime code)
    • Fujii: ? (Fire drill)
    • Ishizaki:
    • Hirata: 8 - 11 (Fire drill/BS)
    • Sato: 7-9 (Fire drill/Accelerometer test)
    • Enzo: 8-11 (PR3 disassembly)
    • Ohishi:

Next meeting

On 2016/11/4(Fri)

VIS F2F: Nov. 18, Dec. 2