Differences between revisions 1 and 18 (spanning 17 versions)
Revision 1 as of 2016-10-26 15:21:59
Size: 1613
Editor: YoichiAso
Comment:
Revision 18 as of 2016-10-28 17:51:28
Size: 4946
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Participants: Participants: Takahashi, Mark, Sato, Tanaka, Okutomi, Ishizaki, Aso, Enzo, Hirata, Akutsu, Shoda, Fujii, Raffaele
Line 9: Line 9:
Schedule Chart ([[https://www.dropbox.com/s/2q2elzj6s4lep6r/VIS%20Overall%20Schedule-20161014.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/kwo9bxfb2711jkx/VIS%20Overall%20Schedule-20161014.mpp?dl=0|MPP]]) Schedule Chart ([[https://www.dropbox.com/s/2q2elzj6s4lep6r/VIS%20Overall%20Schedule-20161014.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/kwo9bxfb2711jkx/VIS%20Overall%20Schedule-20161014.mpp?dl=0|MPP]]) '''To Be Updated'''
Line 12: Line 12:
 * Put a report here  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]]
 * Pre-isolator: The top filter was mounted onto the IP. The shaft screw of motor was not matching to the slider for fishing rod. New shafts were ordered.
 * EQ stop, release sensor, dummy payload: Production is on going.
 * BF damper: Open bidding is on 9th November.
 * Maraging wire: Hirata-san made 2D drawings. The wires will be ordered soon.
  * Asking CRY to check the rod design for suspending the cryogenic payload. Set a deadline for the answer (Takahashi)
 * Installation: Making assembly drawings for the installation procedure document. The review is held on 4th November.
Line 15: Line 21:
 * Put a report here  * Type B Past Week Summary
  * Fabian, Mark and Liu-kun did BS installation at Kamioka:
   * Debugged the issue with the BF keystone being tilted enough to cause rubbing on the yoke for the magnets. It was solved by moving the yoke ≈1 mm taking advantage of the oversized holes.
   * Measured the height of the payload as a function of trim mass. The BF spring seems to have a slightly lower load capacity and a rather higher spring constant than when it was remeasured by Hirata-san.
    * Now the resonant frequency is around 0.6 Hz as opposed to the 0.4 Hz when it was tuned.
    * Continue the test hanging with this configuration, but check if 0.6 Hz is OK or not from the viewpoint of the vibration isolation performance with simulation.
    * Hirata-san will come to Kamioka from Nov. 7 to 11 to check the BF.
   * Removed IM trim mass to set the average height of the keystone to the CAD value.
   * Moved IM trim mass around to set the pitch of the dummy BS and the roll of the IM.
   * Constructed the rest of the IRM around the IM.
  * Hirata-san
   * Prepared to get quotes for different types of "flying saucer" cable clamps (D1504530, D1605625, D1605734).
   * Finished BS assembly drawings (in-tank version) and sent to Saito-sensei).
   * Finished maraging rod 3D models and drawings (for Type A)
   * Modified top plate drawings for PRM inner frame.
Line 18: Line 38:
 * Put a report here  * BFRM
  * Still waiting for ordering process.

 * Stab Flags
  * Waiting for the cost estimation.

 * Assembly frame
  * Asking cost estimate. Also asking to upgrade the assembly frame in the end of November.

 * Install procedure
  * pictures how to install whole suspension chain into the chamber is circulated.
   We will ask the company about the accerelation of the crane, the chain block, and the lever block.
   According to their information, we will buy a chain block or a lever block and test them at Mitaka.

 * Flag removing jig.
  * The model is made by Shoda and approved by Hirose-san. Now the 2D drawing is being made.

 * Disassembly of PR3
  * To be done from Nov. 8 to 11. Enzo and Kasuya-san will join.
Line 23: Line 62:
 * Put a report here  *Conference material PCB Design Draft version.(Oct 21th 2016)[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0057/E1605760/001/Project_WDS_PCB_Design_Ver_0th-161021.pdf|PDF]]
 *Design and preparation(investigation of procurement) for production.[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0057/E1605791/002/Project_WDS_H_W_Assignment_Design_Ver0_1-20161028-1.pdf|PDF]]
 * Will show the design at the next AEL meeting.
Line 26: Line 67:
 * Any issue ?  * No issue
Line 33: Line 74:
 * Type-Bp installation tool: Lever block or Chain block (Shoda)
Line 34: Line 77:
 * Mon: BS test hanging
 * Tue: BS test hanging
 * Wed: BS test hanging
 * Thu: BS test hanging
 * Fri: BS test hanging
 * Mon:
 * Tue:
 * Wed:
 * Thu:
 * Fri:
Line 43: Line 86:
  * Shoda:
  * Mark: 31-11/4 (BS)
  * Shoda: 
  * Mark:
Line 46: Line 89:
  * Okutomi: 31-11/4 (PI realtime model development)   * Okutomi:
Line 50: Line 93:
  * Sato: 31-11/4 (Accelerometer test)   * Sato:
Line 54: Line 97:
  * Takahashi: 7-8 (Extended chief meeting/Fire drill)
  * Shoda: 7-8 (Extended chief meeting/Fire drill)
  * Mark: 8? (Fire drill)
  * Takahashi: 7-9 (Extended chief meeting/Fire drill/Accelerometer test)
  * Shoda: 7-11 (Extended chief meeting/Fire drill/PR3 disassemble)
  * Mark: 8 - 11 (Fire drill/BS)
Line 58: Line 101:
  * Okutomi: 8? (Fire drill)
  * Fujii: 8? (Fire drill)
  * Ishizaki: 8? (Fire drill)
  * Hirata: 8? (Fire drill)
  * Sato: 8? (Fire drill)
  * Okutomi: 7 - 11 (Extended chief meeting/Fire drill/Accelerometer test/Realtime code)
  * Fujii: ? (Fire drill)
  * Ishizaki:
  * Hirata: 8 - 11 (Fire drill/BS)
  * Sato: 7-9 (Fire drill/Accelerometer test)
  * Enzo: 8-11 (PR3 disassembly)
Line 64: Line 108:


Line 71: Line 112:

Agenda/Minutes of the VIS Meeting on 2016/10/28

2016/10/28 13:30 - @Mitaka F2F.

Participants: Takahashi, Mark, Sato, Tanaka, Okutomi, Ishizaki, Aso, Enzo, Hirata, Akutsu, Shoda, Fujii, Raffaele

Progress report

Schedule Chart (PDF,MPP) To Be Updated

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Pre-isolator: The top filter was mounted onto the IP. The shaft screw of motor was not matching to the slider for fishing rod. New shafts were ordered.
  • EQ stop, release sensor, dummy payload: Production is on going.
  • BF damper: Open bidding is on 9th November.
  • Maraging wire: Hirata-san made 2D drawings. The wires will be ordered soon.
    • Asking CRY to check the rod design for suspending the cryogenic payload. Set a deadline for the answer (Takahashi)
  • Installation: Making assembly drawings for the installation procedure document. The review is held on 4th November.

Type B (Mark)

  • Type B Past Week Summary
    • Fabian, Mark and Liu-kun did BS installation at Kamioka:
      • Debugged the issue with the BF keystone being tilted enough to cause rubbing on the yoke for the magnets. It was solved by moving the yoke ≈1 mm taking advantage of the oversized holes.
      • Measured the height of the payload as a function of trim mass. The BF spring seems to have a slightly lower load capacity and a rather higher spring constant than when it was remeasured by Hirata-san.
        • Now the resonant frequency is around 0.6 Hz as opposed to the 0.4 Hz when it was tuned.
        • Continue the test hanging with this configuration, but check if 0.6 Hz is OK or not from the viewpoint of the vibration isolation performance with simulation.
        • Hirata-san will come to Kamioka from Nov. 7 to 11 to check the BF.
      • Removed IM trim mass to set the average height of the keystone to the CAD value.
      • Moved IM trim mass around to set the pitch of the dummy BS and the roll of the IM.
      • Constructed the rest of the IRM around the IM.
    • Hirata-san
      • Prepared to get quotes for different types of "flying saucer" cable clamps (D1504530, D1605625, D1605734).
      • Finished BS assembly drawings (in-tank version) and sent to Saito-sensei).
      • Finished maraging rod 3D models and drawings (for Type A)
      • Modified top plate drawings for PRM inner frame.

Type-Bp (Shoda)

  • BFRM
    • Still waiting for ordering process.
  • Stab Flags
    • Waiting for the cost estimation.
  • Assembly frame
    • Asking cost estimate. Also asking to upgrade the assembly frame in the end of November.
  • Install procedure
    • pictures how to install whole suspension chain into the chamber is circulated.
      • We will ask the company about the accerelation of the crane, the chain block, and the lever block. According to their information, we will buy a chain block or a lever block and test them at Mitaka.
  • Flag removing jig.
    • The model is made by Shoda and approved by Hirose-san. Now the 2D drawing is being made.
  • Disassembly of PR3
    • To be done from Nov. 8 to 11. Enzo and Kasuya-san will join.

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Conference material PCB Design Draft version.(Oct 21th 2016)PDF

  • Design and preparation(investigation of procurement) for production.PDF

  • Will show the design at the next AEL meeting.

Safety

  • No issue

Discussion

  • Suspension naming convention (Okutomi)
  • Type-Bp installation tool: Lever block or Chain block (Shoda)

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 10/31):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 11/7):
    • Takahashi: 7-9 (Extended chief meeting/Fire drill/Accelerometer test)
    • Shoda: 7-11 (Extended chief meeting/Fire drill/PR3 disassemble)
    • Mark: 8 - 11 (Fire drill/BS)
    • Fabian:
    • Okutomi: 7 - 11 (Extended chief meeting/Fire drill/Accelerometer test/Realtime code)
    • Fujii: ? (Fire drill)
    • Ishizaki:
    • Hirata: 8 - 11 (Fire drill/BS)
    • Sato: 7-9 (Fire drill/Accelerometer test)
    • Enzo: 8-11 (PR3 disassembly)
    • Ohishi:

Next meeting

On 2016/11/4(Fri)

VIS F2F: Nov. 18, Dec. 2