⇤ ← Revision 1 as of 2016-10-26 15:21:59
Size: 1613
Comment:
|
Size: 1679
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 32: | Line 32: |
* Type-Bp installation tool: Lever block or Chain block (Shoda) |
Agenda/Minutes of the VIS Meeting on 2016/10/28
2016/10/28 13:30 - @Mitaka F2F.
Participants:
Progress report
Type-A (Takahashi)
- Put a report here
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Suspension naming convention (Okutomi)
- Type-Bp installation tool: Lever block or Chain block (Shoda)
Site work plan for the next week
- Mon: BS test hanging
- Tue: BS test hanging
- Wed: BS test hanging
- Thu: BS test hanging
- Fri: BS test hanging
Travel Plans
- Travel (Week of 10/31):
- Takahashi:
- Shoda:
- Mark: 31-11/4 (BS)
- Fabian:
- Okutomi: 31-11/4 (PI realtime model development)
- Fujii:
- Ishizaki:
- Hirata:
- Sato: 31-11/4 (Accelerometer test)
- Ohishi:
- Travel (Week of 11/7):
- Takahashi: 7-8 (Extended chief meeting/Fire drill)
- Shoda: 7-8 (Extended chief meeting/Fire drill)
- Mark: 8? (Fire drill)
- Fabian:
- Okutomi: 8? (Fire drill)
- Fujii: 8? (Fire drill)
- Ishizaki: 8? (Fire drill)
- Hirata: 8? (Fire drill)
- Sato: 8? (Fire drill)
- Ohishi:
Next meeting
On 2016/11/4(Fri) VIS F2F: Nov. 18, Dec. 2