Differences between revisions 1 and 2
Revision 1 as of 2016-10-26 15:21:59
Size: 1613
Editor: YoichiAso
Comment:
Revision 2 as of 2016-10-26 16:18:10
Size: 1679
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
 * Type-Bp installation tool: Lever block or Chain block (Shoda)

Agenda/Minutes of the VIS Meeting on 2016/10/28

2016/10/28 13:30 - @Mitaka F2F.

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Put a report here

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Any issue ?

Discussion

  • Suspension naming convention (Okutomi)
  • Type-Bp installation tool: Lever block or Chain block (Shoda)

Site work plan for the next week

  • Mon: BS test hanging
  • Tue: BS test hanging
  • Wed: BS test hanging
  • Thu: BS test hanging
  • Fri: BS test hanging

Travel Plans

  • Travel (Week of 10/31):
    • Takahashi:
    • Shoda:
    • Mark: 31-11/4 (BS)
    • Fabian:
    • Okutomi: 31-11/4 (PI realtime model development)
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato: 31-11/4 (Accelerometer test)
    • Ohishi:
  • Travel (Week of 11/7):
    • Takahashi: 7-8 (Extended chief meeting/Fire drill)
    • Shoda: 7-8 (Extended chief meeting/Fire drill)
    • Mark: 8? (Fire drill)
    • Fabian:
    • Okutomi: 8? (Fire drill)
    • Fujii: 8? (Fire drill)
    • Ishizaki: 8? (Fire drill)
    • Hirata: 8? (Fire drill)
    • Sato: 8? (Fire drill)
    • Ohishi:

Next meeting

On 2016/11/4(Fri) VIS F2F: Nov. 18, Dec. 2

KAGRA/Subgroups/VIS/VISMinutes20161028 (last edited 2016-10-28 17:55:11 by YoichiAso)