Size: 2166
Comment:
|
Size: 2170
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
* Transportation: The pre-isolator and the GAS filters were transported to the 2nd floor of Y-end on 7-8th successfully. The second transportation is scheduled on 10-11th in January. | * Transportation: The pre-isolator and the GAS filters were transported to the 2nd floor of Y-end on 7-8th successfully. The second transportation is scheduled on 10-11th in January. |
Agenda/Minutes of the VIS Meeting on 2016/12/9
2016/12/9 13:30 -
Participants:
Progress report
Type-A (Takahashi)
- Transportation: The pre-isolator and the GAS filters were transported to the 2nd floor of Y-end on 7-8th successfully.
- The second transportation is scheduled on 10-11th in January.
- Pre-isolator: The assembly of pre-isolators for SR was started in ATC.
- EQ stop, release sensor, dummy payload: The parts remained will be delivered on 12th.
- BF damper: The production is on going.
- Maraging wire: The production is on going.
- Tooling for installation: The support frame for the PI was ordered. Investigating a fiber scope.
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Incidents:
- Foreseen risks:
Discussion
- Mirror box modification status (Shoda)
Site work plan for the next week
- Mon: BS/PR3 assembly frame
- Tue: BS/PR3 assembly frame
- Wed: BS
- Thu: BS
- Fri: BS
Travel Plans
- Travel (Week of 12/12):
- Takahashi:
- Shoda: 12/12-13 Assembly frame, 12/15 or 16 (Kashiwa)
- Mark: 12/12-12/16 (depending on BS vs SRx progress)
- Fabian: 12/12-12/16
- Okutomi:
- Fujii: 12/15 or 16 (Kashiwa)
- Ishizaki:
- Hirata:
- Sato:
- Enzo: 12/12-12/16 (for Type B )
- Ohishi:
- Travel (Week of 12/19):
- Takahashi: 19-23 (Ext. Cheif Meeting/PI install)
- Shoda: 19-23 (Ext. Cheif Meeting/PR3 test hanging)
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki: 19-23 (PI install)
- Hirata:
- Sato:
- Enzo: 20-23 (PR3 test hanging)
- Ohishi:
Next meeting
On 2016/12/16(Fri)