Progress report
Schedule Chart (PDF,MPP) (To Be Updated)
Type-A (Takahashi)
- Put a report here
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Incidents:
- Foreseen risks
Discussion
- Wires for RM. 0.65 (seems to be too thick), 0.6, or more thinner?? (Shoda)
- Type-B simulation results (Okutomi)
Site work plan for the next week
- Mon: extended chief meeting
- Tue: PI installation
- Wed: PI installation
- Thu: PI installation
- Fri: Holiday
Travel Plans
- Travel (Week of 12/19):
- Takahashi: 19-22 (Ext. Cheif Meeting/PI install)
- Shoda: 19-22 (Ext. Cheif Meeting/PR3 test hanging)
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki: 20-22 (PI install)
- Hirata:
- Sato:
- Enzo: 20-22 (PR3 test hanging)
- Ohishi:
- Travel (Week of 12/26):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
Next meeting
On 2017/1/6(Fri)