Agenda/Minutes of the VIS Meeting on 2017/2/10

2017/2/10 13:30 -

Participants: Mark, Shoda, Ishizaki, Sato, Okutomi, Aso, Takahashi, Ohishi, Hirata, Fabian, Enzo, Fujii, Tanaka

Progress report

Schedule Chart : (PDF,MPP)

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Discussion

Type-Bp (Shoda)

Past week report

Plan for coming weeks

Discussion

IMMT (Ohishi)

Past week report

Looking for jig parts http://klog.icrr.u-tokyo.ac.jp/osl/?r=2439

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

*PCB design for interface connecting WSD and host system (digital system for KAGRA). This box(19' Rack 1U box) is for communicating the state of WDS to the host system and remotely controlling the return from shutdown from the host system.

Plan for coming weeks

Safety

Discussion

Travel Plans

Next meeting

On 2017/2/17(Fri) in Mitaka

March VIS F2F: March 3

KAGRA/Subgroups/VIS/VISMinutes20170210 (last edited 2017-02-16 16:38:35 by NobuyukiTanaka)