Agenda/Minutes of the VIS Meeting on 2017/3/31
2017/3/31 13:30 -
Participants:
Progress report
Type-A (Takahashi)
Past week report
Installation in Y-end: No work at the site.
- Odered some items for the X-end (chain blocks, hand lifter).
- Preparing for the Type-A experiments (modification of geophone pod).
Plan for coming weeks
- Assemble the F2 stage.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Operational test(for power unit) acquisition and analysis of thermal data.-->ReportPDF(JGW-E1706434)
- Main board(WDS main PCB) mounting and implementation.
Plan for coming weeks
- Main board(WDS main PCB) mounting and implementation(Ongoing).
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 4/3):
- Takahashi: 3-6
- Shoda: 3-6
- Mark: 3-6
- Fabian: 3-6
- Okutomi: 3-6
- Fujii:
- Ishizaki: ?-6
- Hirata: 3-6
- Sato: 3-6
- Enzo: 3-6
- Ohishi:
- Tanaka:
- Perry: 3-7
- Sekiguchi(Hosei): ?-?
- Hirayama(Hosei): ?-?
- Wada (Ando Lab.): 3-5
- Travel (Week of 4/10):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Perry:
- Sekiguchi(Hosei):
- Hirayama(Hosei):
Next meeting
On 2017/4/7(Fri) F2F@Mitaka