Line 37: Line 37:
 * 14th(Fri): Replacement of the hoist.  * 14th(Fri): Replacement of the hoist in Y-end.

Agenda/Minutes of the VIS Meeting on 2017/4/7

2017/4/7 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

Type-A (Takahashi)

Past week report

Installation in Y-end:

3th(Mon)

  • Lifted down the maraging wire for cryo-payload into the cryo-shield.

4th(Tue)

  • Reinstalled the maraging wire for cryo-payload.
  • Assembled the EQ stop for F2.
  • Assembled the cables for F2.

5th(Wed)

  • Assembled the cables for F2-F3.
  • Put the F2 base onto the end plate of EQ stop with the maraging wire for F3.
  • Released the keystone of F2.

6th(Thu)

  • Tuned the F2. The two ballast weights were taken from inside the F2.
  • Adjust the height of release sensor for F2.
  • Calibrated the LVDT on F2.

Plan for coming weeks

  • Finish the cabling between F2 and F3.
  • Lift down the F3 stage into the corrugate tube.
  • 10th(Mon): Shipping of the items for X-end by Ishizaki (Mitaka).
  • 11th(Tue): Delivery of the items (Kamioka). Preparation for the transportation to X-end.
  • 12th(Wed): Transportation to X-end by MESCO with Ishizaki.
  • 13th(Thr): Preparation for the replacement of hoist.
  • 14th(Fri): Replacement of the hoist in Y-end.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 4/10):
    • Takahashi: 10-14
    • Shoda:10-14

    • Mark: 10-14
    • Fabian: 10-14
    • Okutomi: 10-14
    • Fujii:
    • Ishizaki: 11-14
    • Hirata: 11-14
    • Sato: 10-14
    • Enzo: 10-14
    • Ohishi:
    • Tanaka:
    • Perry: 10-14
    • Sekiguchi(Hosei):11-14
    • Hirayama(Hosei):11-14
  • Travel (Week of 4/17):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Hashimoto (Hosei Univ.):
    • Ohishi:
    • Tanaka:

Next meeting

On 2017/4/14(Fri)

KAGRA/Subgroups/VIS/VISMinutes20170407 (last edited 2017-04-08 08:48:36 by YoichiAso)