* Preparation for PR2 installation[ * Traverser was aligned on the top plate, and moved out of the clean booth. * RM was assembled except for the front ring. * Assembly frame was set. * Hanging frame was not properly set on the assembly frame. we rotated the hanging frame by 180 degrees, and re-set some parts properly. * BF LVDTs were assembled and calibrated * PRM IM assembly * PEEK parts are missing though we found them on 1/11/2017... * PR2 gluing * All the PR2 flags were removed last weekend. * Gluing is on going at Kashiwa. |
|
Line 25: | Line 39: |
* Hang the mirror and RM. |
Agenda/Minutes of the VIS Meeting on 2017/6/9
2017/6/9 13:30 -
Participants:
Progress report
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- Preparation for PR2 installation[
- Traverser was aligned on the top plate, and moved out of the clean booth.
- RM was assembled except for the front ring.
- Assembly frame was set.
- Hanging frame was not properly set on the assembly frame. we rotated the hanging frame by 180 degrees, and re-set some parts properly.
- BF LVDTs were assembled and calibrated
- PRM IM assembly
- PEEK parts are missing though we found them on 1/11/2017...
- PR2 gluing
- All the PR2 flags were removed last weekend.
- Gluing is on going at Kashiwa.
Plan for coming weeks
- Hang the mirror and RM.
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Other site works
- Preparation for the power outage by 6/16
- Preparation for the PR floor re-work by 6/16
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
* Travel (Week of 6/12):
- Takahashi: 12-16
- Shoda: 12-16
- Mark: 12-16
- Fabian: 12-16
- Okutomi: 12-16
- Fujii:
- Ishizaki: CAD work in Mitaka
- Hirata: 12-16
- Sato: 12-16
- Enzo: 12-16
- Ohishi:
- Tanaka:
- Akiyama(Hosei): 13-16
- Hashimoto(Hosei): 12-15
- Travel (Week of 6/19):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Akiyama(Hosei):
- Hashimoto(Hosei):
Next meeting
On 2017/6/16(Fri) Next F2F: 6/30(Fri)