Agenda/Minutes of the VIS Meeting on 2017/6/9
2017/6/9 13:30 -
Participants:
Progress report
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Installation in Y-end:
6th(Tue)
- Tuned the TF. The frequency was 0.30Hz. More compression is necessary.
- Checked the range of FR on the TF. It was 1.5mm. The motor coupler should be replaced.
- Set the F1 height to 60mm by the bottom screws, and hooked the wire to the receptacle on the TF.
- Inserted the wire clamp onto the top plate.
- Measured the yaw deviation of the EQ stop.
- Calibrated the LVDT on the TF.
7th(Wed)
- Made three spacers of 60mm long for the F1.
- Tested hooking of the wire using the removable spacers.
- Set the F1 on the spacers. The bridge frame was dismounted.
- Lifted up the EQ stop and adjusted the yaw deviation.
- Applied cabling to the top plate along the rod of the EQ stop.
8th(Thu)
- Lifted down the EQ stop. The top plate was put on the frame lock.
- Adjusted the position of the frame lock.
- Installed the PI into the chamber. The PI was put on the cone bellows.
- Checked the dimensions around the BF in the cross tube.
9th(Fri)
- Hung the filter chain from the TF.
Plan for coming weeks
- Set the PI in the chamber (Cabling, ACC).
- Set the BF damper in the cross tube.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- Preparation for PR2 installation.
- Traverser was aligned on the top plate, and moved out of the clean booth.
- RM was assembled except for the front ring.
- Assembly frame was set.
- Hanging frame was not properly set on the assembly frame. we rotated the hanging frame by 180 degrees, and re-set some parts properly.
- BF LVDTs were assembled and calibrated.
- PRM IM assembly
- PEEK parts (F00003: support upper mass) are missing though we found them on 1/11/2017...
- The picomotors at IOO cannot be used for IM because the length is different.
- The IM was partially assembled and put in the plastic box with un-assembled parts and screws.
- PR2 gluing
- All the PR2 flags were removed last weekend.
- Gluing is on going at Kashiwa.
Plan for coming weeks
- Hang the mirror and RM.
IMMT (Ohishi)
Past week report
- Ohishi took inventor stage1 training course from 5th-7th June.
Removed IMMT1 from its chamber on 8th June (klog).
- Magnet fixture jig drawings will be fixed today (FCL).
Plan for coming weeks
- Remove IMMT2 mirror from its suspension (14th June).
- Cabling inside the vacuum chamber and parts check(15th June).
- Machining of magnet fixture jig will start from 12th (FCL).
Watchdog system (Tanaka)
Past week report
Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.
Examination of experimental preamplifier circuit fabrication. -->Ongoing.
Plan for coming weeks
Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.
Examination of experimental preamplifier circuit fabrication. -->Ongoing.
Other site works
- Preparation for the power outage by 6/16
- Preparation for the PR floor re-work by 6/16
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
* Travel (Week of 6/12):
- Takahashi: 12-16
- Shoda: 12-16
- Mark: 12-16
- Fabian: 12-16
- Okutomi: 12-16
- Fujii:
- Ishizaki: CAD work in Mitaka
- Hirata: 12-16
- Sato: 12-16
- Enzo: 12-16
- Ohishi:
- Tanaka:
- Akiyama(Hosei): 13-16
- Hashimoto(Hosei): 12-15
- Travel (Week of 6/19):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Akiyama(Hosei):
- Hashimoto(Hosei):
Next meeting
On 2017/6/16(Fri) Next F2F: 6/30(Fri)