Differences between revisions 1 and 2
Revision 1 as of 2017-06-14 15:57:54
Size: 2022
Editor: YoichiAso
Comment:
Revision 2 as of 2017-06-14 15:58:08
Size: 2023
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 56: Line 56:
* Travel (Week of 6/19):  * Travel (Week of 6/19):

Agenda/Minutes of the VIS Meeting on 2017/6/16

2017/6/16 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • Preparation for the power outage by 6/16
  • Preparation for the PR floor re-work by 6/16
  • 6/19: Power outage
  • 6/21: Safety lecture after the morning briefing
  • 6/21 11:30 - 12:30: Crane inspection
  • 6/20 -24: BS & PR booth: lighting installation (BS and PR2 area 6/23 afternoon)

  • 6/22-23: PR area: floor fix
  • 6/26-30: PR area: stainless steel flooring
  • 6/28: Maintenance of the rapid charger for the electric vehicles

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 6/19):
    • Takahashi: 20-23
    • Shoda: 20-23
    • Mark: 19-23
    • Fabian: 20-22
    • Okutomi: 20-23
    • Fujii:
    • Ishizaki: 20-23
    • Hirata: 20-23
    • Sato: 20-23
    • Enzo: 20-22
    • Ohishi:
    • Tanaka:
    • Akiyama(Hosei): 20-23
    • Hashimoto(Hosei): 20-22
  • Travel (Week of 6/26):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:
    • Tanaka:
    • Akiyama(Hosei):
    • Hashimoto(Hosei):

Next meeting

On 2017/6/23(Fri) Next F2F: 6/30(Fri)

KAGRA/Subgroups/VIS/VISMinutes20170616 (last edited 2017-06-16 17:05:28 by YoichiAso)