Line 32: Line 32:
 * Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->

    * Order electronic parts -->No delivery(Coop Univ.Tokyo).

 * Analysis of experimental results(at 25-26th(KAGRA))[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0070/E1707035/001/Project%20WDS%20Experiment%20at%20KAGRA%2017072526.pdf|JGW-E1707035(PDF)]].

    * Reference (Amp Report on performance test)[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0068/E1706863/001/Project%20WDS%20PreAmp%20Design%20170630.pdf|JGW-E1706863(PDF)]]
Line 33: Line 41:
 * Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

 * Start production of equipment-->PCB check(Ongoing).
Line 48: Line 59:
 * Distance between the optical breadboard and the beam.

Agenda/Minutes of the VIS Meeting on 2017/8/4

2017/8/4 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->

    • Order electronic parts -->No delivery(Coop Univ.Tokyo).

  • Analysis of experimental results(at 25-26th(KAGRA))JGW-E1707035(PDF).

Plan for coming weeks

  • Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

  • Start production of equipment-->PCB check(Ongoing).

Other site works

  • 8/11-8/15 KAGRA site closed
  • 8/23-24 Draft Chamber Installation
  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • Distance between the optical breadboard and the beam.

Travel Plans

  • Travel (Week of 8/7):
    • Takahashi: 7 - 10
    • Okutomi: 7 - 10
    • Sato: 8 - 10
    • Ishizaki: 7 - 10
    • Mark: 7 - 10
    • Fabian:
    • Hirata:
    • Enzo: 8 - 10
    • Shoda: 8 - 10
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Hashimoto(Hosei): 7 - 10
    • Yoshioka (Toyama): 8,9
    • Kozu (ICRR): 9 - 10
    • Arai (ICRR): 7 - 10
  • Travel (Week of 8/14):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Hashimoto(Hosei):
    • Yoshioka (Toyama): 16,18
    • Kozu (ICRR):