Agenda/Minutes of the VIS Meeting on 2017/8/4
2017/8/4 13:30 -
Participants:
Progress report
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->
Order electronic parts -->No delivery(Coop Univ.Tokyo).
Analysis of experimental results(at 25-26th(KAGRA))JGW-E1707035(PDF).
Reference (Amp Report on performance test)JGW-E1706863(PDF)
Plan for coming weeks
Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.
Start production of equipment-->PCB check(Ongoing).
Other site works
- 8/11-8/15 KAGRA site closed
- 8/23-24 Draft Chamber Installation
- End of Aug. to Nov.: Mozumi entrance will be closed
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- Distance between the optical breadboard and the beam.
Travel Plans
- Travel (Week of 8/7):
- Takahashi: 7 - 10
- Okutomi: 7 - 10
- Sato: 8 - 10
- Ishizaki: 7 - 10
- Mark: 7 - 10
- Fabian:
- Hirata:
- Enzo: 8 - 10
- Shoda: 8 - 10
- Ohishi:
- Fujii:
- Tanaka:
- Hashimoto(Hosei): 7 - 10
- Yoshioka (Toyama): 8,9
- Kozu (ICRR): 9 - 10
- Arai (ICRR): 7 - 10
- Travel (Week of 8/14):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Hashimoto(Hosei):
- Yoshioka (Toyama): 16,18
- Kozu (ICRR):
Next meeting
On 2017/8/18(Fri)