Size: 2649
Comment:
|
Size: 3149
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 59: | Line 59: |
*Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).--> *Order electronic parts -->Delivery completed(Coop Univ.Tokyo). *Ex I/O part circuit operation check --> Ok(by Digital I/O board Emulator(switch and Led monitor 32ch). |
|
Line 60: | Line 67: |
*Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing. *Start production of equipment-->PCB check for main board(WDS main board). |
Agenda/Minutes of the VIS Meeting on 2017/8/25
2017/8/25 13:30 -
Participants:
Progress report
Schedule Charts
Schedule summary
- Type-A: Half of week delay
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
[X-end]
21st(Mon)
- Cabling from the F3 to the F2.
22nd(Tue)
- Continued the cabling.
- Calibrated the LVDT in the F2.
- Started the tuning of F2. Initial frequency was 0.7Hz.
23rd(Wed)
- Tuned the F2 with changing the compression of blade. The filter went to bi-stable.
24th(Thu)
- Continued the tuning of F2. The lowest frequency was 0.6Hz.
25th(Fri)
[Y-end]
23rd(Thu)
- Transported the bridge frame to the Y-end entrance.
Plan for coming weeks
- Finish the installation of the Filter2.
- Start the setting of F1.
Type B (Mark)
Past week report
Plan for coming week
Vacation Info
Mark: TBD Mid-Oct
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->
Order electronic parts -->Delivery completed(Coop Univ.Tokyo).
Ex I/O part circuit operation check --> Ok(by Digital I/O board Emulator(switch and Led monitor 32ch).
Plan for coming weeks
Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.
Start production of equipment-->PCB check for main board(WDS main board).
Other site works
- 8/28 11:30 - 12:30 crane inspection
- End of Aug. to Nov.: Mozumi entrance will be closed
Safety
- Incidents: no
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 8/28):
- Takahashi: 28 - 9/1
- Okutomi: 28 - 9/1
- Sato: 28 - 9/1
- Ishizaki: 28 - 9/1
- Mark: 28 - 9/1
- Fabian: 28 - 9/1
- Hirata: 28 - 9/1
- Enzo: 28 - 9/1
- Shoda: 28 - 9/1
- Ohishi:
- Fujii:
- Tanaka:
- Hashimoto(Hosei): 28 - 9/1
- Arai (ICRR): 28 - 9/1
- Yoshioka (Toyama): 29,30,9/1
- Kozu (ICRR): 28 - 9/1
- Travel (Week of 9/4):
- Takahashi: 4-7
- Okutomi: 4-8
- Sato: 4-8
- Ishizaki: 4-8
- Mark:
- Fabian
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Hashimoto(Hosei):
- Yoshioka (Toyama):
- Kozu (ICRR):
- Arai (ICRR):
- Kasuya (TITECH):
Next meeting
On 2017/9/1(Fri)