Line 35: | Line 35: |
*I held a meeting to make estimates with several vendors.-->I also requested a new vendor to make a quote(Waiting). *Waiting for concrete information on installation location.--> *Update installation plan(Placement plan for installing WDS in [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0072/E1707265/001/Project%20WDS%20layout%20170926.pdf|KAGRAJGW-E1707265(PDF)]]). *Request for fabrication of JGW-D1605239(Binary IO Converter Chassis) for use with WDS([[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0072/T1707285/002/20150309_KAGRA_circuit_application_jp-wds171011-v0.docx|JGW-T1707285(docx)]]). *Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Machining is completed. |
|
Line 36: | Line 43: |
*Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Start of wiring and testing for EX I/O box(19 inch chassis). *Execution of the final version operation test for mass production ->Detailed exam(Ongoing). |
|
Line 42: | Line 51: |
* End of Aug. to Nov.: Mozumi entrance will be closed | * End of Aug. to Nov.: Mozumi entrance will be closed -> Finished |
Line 91: | Line 100: |
Agenda/Minutes of the VIS Meeting on 2017/10/20
2017/10/20 13:30 -
Participants:
Progress report
Schedule Chart
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
I held a meeting to make estimates with several vendors.-->I also requested a new vendor to make a quote(Waiting).
Waiting for concrete information on installation location.-->
Update installation plan(Placement plan for installing WDS in KAGRAJGW-E1707265(PDF)).
Request for fabrication of JGW-D1605239(Binary IO Converter Chassis) for use with WDS(JGW-T1707285(docx)).
Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Machining is completed.
Plan for coming weeks
Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Start of wiring and testing for EX I/O box(19 inch chassis).
Execution of the final version operation test for mass production ->Detailed exam(Ongoing).
Other site works
- Annual inspection of the cranes in the center: Oct. 27 (Fri) afternoon.
- Fire drill: Nov. 16 from 11AM - 12AM
- Commissioning Workshop: Nov. 27 to Dec. 1st
End of Aug. to Nov.: Mozumi entrance will be closed -> Finished
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Plan for the coming months
Travel Plans
- Travel (Week of 10/23):
- Takahashi:
- Okutomi: 23 - 27
- Sato:
- Ishizaki: 23 - 27
- Mark: 25 - 27
- Fabian: 23 - 27
- Hirata:
- Enzo: 23 - 27
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR): 23 - 27
- Arai (ICRR): 23 - 27
- Travel (Week of 10/30):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2017/10/27(Fri)