Differences between revisions 7 and 8
Revision 7 as of 2017-10-20 13:07:43
Size: 4166
Editor: EnzoTapia
Comment:
Revision 8 as of 2017-10-20 13:21:20
Size: 4653
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 54: Line 54:
 * Adjust the tilt of PR3 and PR2 for beam alignment
  * PR2 seems to be OK. In the end, PR2 tilt seems to be at around the designed position.
  * PR3 IM OSEMs are very close to touch at the flags. We have not checked the PR3 tilt yet.
  * So far, we do not have time to check the transfer functions because the comissioners need the beam. But we have to check at some point.
  * PR2 and PR2 oplevs are calibrated.
  * Now the beam is delivered to the X-end :)
Line 55: Line 62:
 * Keep aligned

Agenda/Minutes of the VIS Meeting on 2017/10/20

2017/10/20 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

[Enzo, Hirata, Kozu, Fabian]

1. We fixed broken cables in the IP LVDTs.

2. We lowered the lower breadboard (LBB) by 17.5 mm and removed the T500 Koach filters. A new measurement of its position is pending.

3. We removed from the top filter table the three bars of the triangular crane adapter.

4. We were not able to use remotely the vertical fishing rod of the Top Filter. The mechanical design has to be reviewed.

5. In the top filter keystone we put a safety cap which keeps the suspension rod nail head from accidentally unhooking.

6. We got rid of a fifth flange in the BS chamber by re-routing one in-vacuum cable.

7. We added in-air cable extensions in order to have all GAS fishing rods (FR) connected to one stepper motor driver and the three IP horizontal FRs to a separate one. This makes using the current Miyo-kun’s python script easy. The new cable assignment has been reported in the Klog.

8. The horizontal coil-magnet actuators don’t seem to be working before applying 25,000 counts. We’re in the process of investigating this.

9. Enzo worked in the implementation of the control filters for the IM and IP

10. We investigated the coupling from IP horizontal FR YAW actuation into longitudinal degrees of freedom.

SR work: Hirata-san worked with Mirapro in the installation of the SR LBBs. He also began doing inventory of SR components.

Plan for coming weeks

Type-Bp (Shoda)

Past week report

  • Adjust the tilt of PR3 and PR2 for beam alignment
    • PR2 seems to be OK. In the end, PR2 tilt seems to be at around the designed position.
    • PR3 IM OSEMs are very close to touch at the flags. We have not checked the PR3 tilt yet.
    • So far, we do not have time to check the transfer functions because the comissioners need the beam. But we have to check at some point.
    • PR2 and PR2 oplevs are calibrated.
    • Now the beam is delivered to the X-end :)

Plan for coming weeks

  • Keep aligned

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • I held a meeting to make estimates with several vendors.-->I also requested a new vendor to make a quote(Waiting).

  • Waiting for concrete information on installation location.-->

  • Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Machining is completed.

Plan for coming weeks

  • Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Start of wiring and testing for EX I/O box(19 inch chassis).

  • Execution of the final version operation test for mass production ->Detailed exam(Ongoing).

Other site works

  • VIP visit from MEXT: Oct. 24th 16:30 - 17:35
  • Annual inspection of the cranes in the center: Oct. 27 (Fri) afternoon.
  • Fire drill: Nov. 16 from 11AM - 12AM
  • Commissioning Workshop: Nov. 27 to Dec. 1st
  • End of Aug. to Nov.: Mozumi entrance will be closed -> Finished

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Plan for the coming months

Travel Plans

  • Travel (Week of 10/23):
    • Takahashi:
    • Okutomi: 23 - 27
    • Sato:
    • Ishizaki: 23 - 27
    • Mark: 25 - 27
    • Fabian: 23 - 27
    • Hirata:
    • Enzo: 23 - 27
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR): 23 - 27
    • Arai (ICRR): 23 - 27
  • Travel (Week of 10/30):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/10/27(Fri)

KAGRA/Subgroups/VIS/VISMinutes20171020 (last edited 2017-10-20 14:31:25 by YoichiAso)