Agenda/Minutes of the VIS Meeting on 2017/11/10

2017/11/10 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF,MPP)

Type-B: (PDF,MPP)

Type-A (Takahashi)

Past week report

[X-end]

[Mitaka]

Plan for coming weeks

Type B (Mark)

Past two weeks report

Kamioka (Mark, Enzo, Kozu-kun):

Mitaka (Fabian, Hirata-san):

Plan for week of 11/13

Enzo and Kozu-kun at Mitaka

Mark and Fabian at Kamioka.

Hirata-san at Mitaka

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

*I want to start ordering mass production version.-->Waiting.

*Execution of the final version operation test for mass production -->Completed(Clear all operation test).

*Experiments in phase 2 and phase 3(However,only one 4ch WDS main box is to be tested).-->Waiting(Changing travel schedule).

*Designing and manufacturing testing tools for mass production equipment.-->Completed.

Plan for coming weeks

*Star of order related works.

*Operation test of the testing tool for mass production equipment.

*Business trip plan.--> I stay at Toyama on the 19th.And experiment in Kamioka from 20th to 22nd.

Other site works

Safety

Discussion

Plan for the coming months

Travel Plans

Next meeting

On 2017/11/17(Fri)