Agenda/Minutes of the VIS Meeting on 2017/11/10
2017/11/10 13:30 -
Participants:
Progress report
Schedule Chart
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
*I want to start ordering mass production version.-->Waiting.
*Execution of the final version operation test for mass production -->Completed(Clear all operation test).
*Experiments in phase 2 and phase 3(However,only one 4ch WDS main box is to be tested).-->Waiting(Changing travel schedule).
*Designing and manufacturing testing tools for mass production equipment.-->Completed.
Plan for coming weeks
*Star of order related works.
*Operation test of the testing tool for mass production equipment.
*Business trip plan.--> I stay at Toyama on the 19th.And experiment in Kamioka from 20th to 22nd.
Other site works
- In the week of Nov. 13th: Fixing the water leaks around the BS area.
- Fire drill: Nov. 16 from 11AM - 12AM
- Commissioning Workshop: Nov. 27 to Dec. 1st
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Plan for the coming months
Travel Plans
- Travel (Week of 11/13):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 11/20):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2017/11/17(Fri)