Line 19: Line 19:

[X-end]
  * Recovered from the blackout.
  * Lifted down the EQ stop to release the bottom stopper for BF.
  * Set the F2 stage on the frame lock and cabled between F1 and F2.
  * Suspended the filter chain from the F1, and checked the load for F1.
  * Set the F1 stage on the frame lock and extended the EQ stop.
  * Started the cabling between F0 and F1.
  * Set the top ring onto the frame lock.
Line 20: Line 30:
  * X-end: Installation of the pre-isolaotor and reassembly of the BF damper.
  * Y-end: Connection to the cryo-payload.
Line 35: Line 47:
 *I want to start ordering mass production version.-->*Waiting.
                                                     *The execution of the budget was stopped by AEL.
                                                   -->Budget execution was allowed.(Meeting at Kamioka.)

 *Star of order related works.-->Completed(Coop Univ.Tokyo and anther corp.).
 
 *Operation test of the testing tool for mass production equipment.-->Completed.

 *I stay at Toyama on the 19th.And experiment in Kamioka from 20th to 22nd.-->20th I could't experiment by power outage.21th Completed the connection experiment with the digital system.
 22nd The cutoff operation test does not go well.-->
  *DC power supply fault(?).
  *I can't see the driver output and sensor output.
Line 36: Line 61:
 *Plan the operation test again at KAGRA.
 
 *Retest in Mitaka.
 
 *Start ordering mass production version.-->Start preparations.
Line 52: Line 82:

 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7077|Type-B assembly drawings]]
 *[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5816|Type-Bp drawings]]

Agenda/Minutes of the VIS Meeting on 2017/11/24

2017/11/24 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

[X-end]

  • Recovered from the blackout.
  • Lifted down the EQ stop to release the bottom stopper for BF.
  • Set the F2 stage on the frame lock and cabled between F1 and F2.
  • Suspended the filter chain from the F1, and checked the load for F1.
  • Set the F1 stage on the frame lock and extended the EQ stop.
  • Started the cabling between F0 and F1.
  • Set the top ring onto the frame lock.

Plan for coming weeks

  • X-end: Installation of the pre-isolaotor and reassembly of the BF damper.
  • Y-end: Connection to the cryo-payload.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • I want to start ordering mass production version.-->*Waiting.

    • The execution of the budget was stopped by AEL.
    • -->Budget execution was allowed.(Meeting at Kamioka.)

  • Star of order related works.-->Completed(Coop Univ.Tokyo and anther corp.).

  • Operation test of the testing tool for mass production equipment.-->Completed.

  • I stay at Toyama on the 19th.And experiment in Kamioka from 20th to 22nd.-->20th I could't experiment by power outage.21th Completed the connection experiment with the digital system. 22nd The cutoff operation test does not go well.-->

    • DC power supply fault(?).
    • I can't see the driver output and sensor output.

Plan for coming weeks

  • Plan the operation test again at KAGRA.
  • Retest in Mitaka.
  • Start ordering mass production version.-->Start preparations.

Other site works

  • Commissioning Workshop: Nov. 27 to Dec. 1st

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Brainstorming on how to exchange the payload part without completely disassembling the suspension chain

Travel Plans

  • Travel (Week of 11/27):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 12/4):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/12/1(Fri)