Agenda/Minutes of the VIS Meeting on 2017/11/24
2017/11/24 13:30 - 15:00
Participants: Enzo, Shoda, Takahashi, Ohishi, Arai, Sato, Okutomi, Aso, Mark, Hirata, Fabian, Tanaka, Raffaele
Progress report
Schedule Chart
- Type-A: On schedule for the cable replacement (2 days delay expected in the next week)
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
[X-end]
- Recovered from the blackout.
- Lifted down the EQ stop to release the bottom stopper for BF.
- Set the F2 stage on the frame lock and cabled between F1 and F2.
- Suspended the filter chain from the F1, and checked the load for F1.
- Set the F1 stage on the frame lock and extended the EQ stop.
- Started the cabling between F0 and F1.
- Set the top ring onto the frame lock.
Plan for coming weeks
- X-end: Installation of the pre-isolaotor and reassembly of the BF damper.
- Y-end: Connection to the cryo-payload.
Type B (Mark)
Past week report
- Mark worked on SR2 planning.
- Mark thought through what would be required to swap an optic (e.g., SRM) in situ (JGW-T1707436).
- Hirata-san tried removing disks from IM flags (so we could reuse them in flag bases and make a complete set for SR2) but only got 1 of 4 out.
- Hirata-san ordered more disks for IM flags.
- Hirata-san asked for quotes on SF LBB blades.
- Hirata-san got a reduced quote for the LBB damper rings.
- Hirata-san received and cleaned suspension wires for the SR.
- Fabian worked on the SR mass budget.
- Fabian worked out the COM of the SR2 optic, and Mark used it to derive the proper prism positions.
- Enzo and Kozu-kun worked on control filter design and installation.
Plan for week of 11/27
- Fabian at commissioning workshop
- Hirata-san at Kamioka Tue-Fri to work with Mirapro on SRM LBB installation.
- All others (Mark, Enzo, Shoda-san, Kozu-kun) at Kamioka to start SR2 assembly.
- Mark from Mon lunchtime.
- Kozu-kun from Mon lunchtime through Wed.
- Mirror gluing.
- SR2 rack setup.
Plan for week of 12/4
- All at Kamioka
- IM assembly and pico test.
- Assembly frame alignment and optical table centering.
- OL setup.
Vacation Info
- Mark 12/22-1/3
- Enzo TBD, probably 12/22-1/3
- Fabian 12/22-1/5
- Hirata-san 12/21-22 (conference)
Type-Bp (Shoda)
Past week report
- Recovered from the power outage
- PRM tried to be released
- The suspension hits to the EQ stop. We found that the inner frame was tilted.
- We inserted the sims below the Traverser top plate.
- The bellows legs of the tank were not perfectly tightened...??
Plan for coming weeks
- PRM release trial again
- Re-alignment of the main beam
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
I want to start ordering mass production version.-->*Waiting.
- The execution of the budget was stopped by AEL.
-->Budget execution was allowed.(Meeting at Kamioka.)
Start of order related works.-->Completed(Coop Univ.Tokyo and anther corp.).
Operation test of the testing tool for mass production equipment.-->Completed.
I stay at Toyama on the 19th.And experiment in Kamioka from 20th to 22nd.-->20th I could't experiment by power outage.21th Completed the connection experiment with the digital system. 22nd The cutoff operation test does not go well.-->
- DC power supply fault(?).
- I can't see the driver output and sensor output.
Plan for coming weeks
- Plan the operation test again at KAGRA.
- Retest in Mitaka.
Start ordering mass production version.-->Start preparations.
Other site works
- Commissioning Workshop: Nov. 27 to Dec. 1st
Safety
- Incidents: Dropped a nut inside the PRM chamber.
- Foreseen risks
- Type-A: Crane work
- Type-B: No heavy work expected
- Type-Bp: Be careful with the PRM release.
Discussion
Brainstorming on how to exchange the payload part without completely disassembling the suspension chain
- Two possible methods
- Common part: pull out the suspension from the chamber and put it on the assembly frame.
- Mark's idea: Make smaller winch systems for TM hanging, which can be used with the BF sitting above the IM.
- How to align the suspension chain with the sliding rails of the assembly frame is a challenge.
- Shoda-san's idea: Unhook the rod connecting the BF and IM. Then remove the top part (down to BF) and put it temporarily in the chamber.
- Is unhooking possible ?
- Alignment of the top part with the payload part when connecting again may be a challenge.
- IMRM adjustment may be difficult.
- Conclusion: We should think about the ideas presented today and discuss it again in the next meeting to decide the next action.
Travel Plans
- Travel (Week of 11/27):
- Takahashi: 27 - 12/1
- Okutomi: 29 - 12/1
- Sato: 27 - 12/1
- Ishizaki: 28 - 12/1 (?)
- Mark: 27 - 12/1
- Fabian: 27 - 12/1
- Hirata: 28 - 12/1
- Enzo: 27 - 12/1
- Shoda: 27 - 12/1
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR): 27 - 29
- Arai (ICRR): 27 - 12/1
- Travel (Week of 12/4):
- Takahashi: 4 - 8
- Okutomi: 4 - 8
- Sato: 4 - 8
- Ishizaki: 4 - 8
- Mark: 4 - 8
- Fabian: 5 - 8
- Hirata: 4 - 8
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR): ?
- Arai (ICRR):
Next meeting
On 2017/12/1(Fri)