Agenda/Minutes of the VIS Meeting on 2017/12/8
2017/12/8 13:30 -
Participants:
Progress report
Schedule Chart
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
PR3 slipped so often during the IM adjustment -> optic was fixed to the RM.
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Retest in Mitaka.-->There is no problem in operation test at all(The result is the same this week as well!!).
Start ordering mass production version.-->Ongoing(Formal request for quotation from the vendors.).
- Waiting for arrival of mailing(by paper quotation).
Plan for coming weeks
Plan the operation test again at KAGRA-->
- Actual test of WD operation(Retest).
The next on site test of the WDS: From 12/12(Tue) - 14(Thu) 11th:In Toyama,12th-14th:Kamioka,15th:Preparation day(Toyama->Tokyo).
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
2nd Brainstorming on how to exchange the payload part without completely disassembling the suspension chain
What to do with the Type-Bp tilt change ?
Travel Plans
- Travel (Week of 12/11):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 12/18):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2017/12/15(Fri) from 15:00 @ Control Room