Size: 4335
Comment:
|
Size: 4444
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 112: | Line 112: |
* Takahashi: * Okutomi: * Sato: * Ishizaki: * Mark: * Fabian: * Hirata: * Enzo: * Shoda: |
* Takahashi: 11-13 * Okutomi: 11-15 * Sato: 11-15 * Ishizaki: 11-15 * Mark: 11-15 * Fabian: 11-15 * Hirata: 11-15 * Enzo: 11-15 * Shoda: 11-15 |
Line 123: | Line 123: |
* Tanaka: * Kozu (ICRR): * Arai (ICRR): |
* Tanaka: 12-14 * Kozu (ICRR): 11-13 |
Line 129: | Line 127: |
* Takahashi: * Okutomi: * Sato: * Ishizaki: * Mark: * Fabian: * Hirata: * Enzo: |
* Takahashi: 18 - 22 * Okutomi: 18 - 22 * Sato: 18 - 22 * Ishizaki: 18 - 22 * Mark: 18 - 20 * Fabian: 18 - 20 * Hirata: 18 - 20 * Enzo: 18 - 20 |
Line 141: | Line 139: |
* Kozu (ICRR): | * Kozu (ICRR): 18 - 20 |
Agenda/Minutes of the VIS Meeting on 2017/12/8
2017/12/8 13:30 -
Participants:
Progress report
Schedule Chart
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
[X-end]
- Installed the PI into the chamber.
- Hooked the wires for filter and SF damper to the receptacles.
- Cabled from the wire clamp on wire to the feedthroughs and checked connections.
- Adjusted the position of bottom anchor and the yaw rotation of BF damper.
- Tuned the TF.
- Reassembled the BF damper.
- Checked the ACCs with the drivers.
[Y-end]
- Set the stepping motor drivers.
- Tuned the BF, the F3. and the TF.
- Adjusted the yaw rotation of BF damper.
- Released the IP. Adjusted the DC position.
- Closed the top chamber.
Plan for coming weeks
- X-end: Install the ACCs. Close the chambers.
- Y-end: Align the cryo-payload.
Type B (Mark)
Past week report
- Mark analyzed the QPD data from Friday 12/1 and derived matrices to diagonalize the QPD, and calibrate output in µrad. In the process an error in the IM OSEM diagonalization was discovered: the P and Y gains were low by a factor 2.
- Mark re-zeroed the QPD after noting the micrometer readings so we can do TFs over the weekend.
- We prepared for the SR2 gluing:
- We aligned the SR2 in the box with the wedge on the correct side.
- We checked that the remachined BS prism holders fit on the PR2 mirror box.
- We checked that with Tatsumi-san's support ring, the prisms would go on at the right height.
- We checked the new magnet jigs.
- We glued ferromagnetic disks in a large number of IM flag tips and flag bases, and in the SR magnet jigs.
- We also glued SR magnets in the magnet bases.
- Hirata-san worked on procurement of magnets, payload parts, and also got the delivery of the ferromagnetic disks expedited so we could have them this week.
Plan for week of 12/11
- Mark, Fabian, Enzo, Kozu-kun (Mon-Thu only), Hirata-san, Shoda-san at Kamioka.
- Mirror gluing.
- IM assembly and pico test.
- Assembly frame alignment and optical table centering.
- Move trolley system from SR3.
- OL setup.
Plan for week of 12/18
- Shoda-san vacation
- Mark, Fabian, Enzo, Kozu-kun at Kamioka Mon-Wed.
Vacation Info
- Mark 12/22-1/3
Enzo, 12/21-12/27 (but not 12/28)
- Fabian 12/22-1/5
- Hirata-san 12/21-22 (conference)
- Shoda-san 12/18-21
Type-Bp (Shoda)
Past week report
PR3 slipped so often during the IM adjustment -> optic was fixed to the RM.
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Retest in Mitaka.-->There is no problem in operation test at all(The result is the same this week as well!!).
Start ordering mass production version.-->Ongoing(Formal request for quotation from the vendors.).
- Waiting for arrival of mailing(by paper quotation).
Plan for coming weeks
Plan the operation test again at KAGRA-->
- Actual test of WD operation(Retest).
The next on site test of the WDS: From 12/12(Tue) - 14(Thu) 11th:In Toyama,12th-14th:Kamioka,15th:Preparation day(Toyama->Tokyo).
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
2nd Brainstorming on how to exchange the payload part without completely disassembling the suspension chain
What to do with the Type-Bp tilt change ?
Travel Plans
- Travel (Week of 12/11):
- Takahashi: 11-13
- Okutomi: 11-15
- Sato: 11-15
- Ishizaki: 11-15
- Mark: 11-15
- Fabian: 11-15
- Hirata: 11-15
- Enzo: 11-15
- Shoda: 11-15
- Ohishi:
- Fujii:
- Tanaka: 12-14
- Kozu (ICRR): 11-13
- Travel (Week of 12/18):
- Takahashi: 18 - 22
- Okutomi: 18 - 22
- Sato: 18 - 22
- Ishizaki: 18 - 22
- Mark: 18 - 20
- Fabian: 18 - 20
- Hirata: 18 - 20
- Enzo: 18 - 20
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR): 18 - 20
- Arai (ICRR):
Next meeting
On 2017/12/15(Fri) from 15:00 @ Control Room