Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:

[Y-end]
  * Connected the PT100 sensor for BF to the monitor system for CRY.
  * Checked the yaw rotation in BF. No problem.
 
[X-front]
  * Installed the main items (footholds, workbench, chairs, tools, etc.) into the clean booth.
  * Attached the release sensors onto the end plate for DP with cabling.
  * Started the assembly of side stopper. The parts for slider had a problem (too tight).

[SRM]
  * Took out the IP and TF from each box.
  * Found the blades (2 of 3) for TF were broken (completely cut off). The blades were removed.
  * Combined the IP and the TF. Connected the IP legs with the TF plate.
  * Cabled the vertical LVDT coils.
  * Fixed the upper plate of LVDT-Actuator units onto the TF plate.
  * Assembled the fishing rod of TF with cabling.
  * Assembled the yaw rotary of receptacle in the TF.
  * Packed the PI into the box.
Line 19: Line 39:
  * The evacuation of EYV chamber will be started in the 23th morning.
  * Pre-assembly of BF damper.
  * Assembly of DP stage.
Line 30: Line 53:
 * Hanging jig parts arrived from FCL. Some minor problems need to be fixed.  * Hanging jig parts arrived from FCL. Some minor problems need to be fixed. Drawings will be delivered today.
Line 40: Line 63:
 * Check hanging jig drawings.
 * Assemble the hanging jig.
Line 41: Line 66:
 * Design OSEM holder.

Agenda/Minutes of the VIS Meeting on 2018/1/19

2018/1/19 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:

Type-A (Takahashi)

Past week report

[Y-end]

  • Connected the PT100 sensor for BF to the monitor system for CRY.
  • Checked the yaw rotation in BF. No problem.

[X-front]

  • Installed the main items (footholds, workbench, chairs, tools, etc.) into the clean booth.
  • Attached the release sensors onto the end plate for DP with cabling.
  • Started the assembly of side stopper. The parts for slider had a problem (too tight).

[SRM]

  • Took out the IP and TF from each box.
  • Found the blades (2 of 3) for TF were broken (completely cut off). The blades were removed.
  • Combined the IP and the TF. Connected the IP legs with the TF plate.
  • Cabled the vertical LVDT coils.
  • Fixed the upper plate of LVDT-Actuator units onto the TF plate.
  • Assembled the fishing rod of TF with cabling.
  • Assembled the yaw rotary of receptacle in the TF.
  • Packed the PI into the box.

Plan for coming weeks

  • The evacuation of EYV chamber will be started in the 23th morning.
  • Pre-assembly of BF damper.
  • Assembly of DP stage.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

  • Hanging jig parts arrived from FCL. Some minor problems need to be fixed. Drawings will be delivered today.
  • Visited machine shop of Toyama Univ. Asked them to make some mechanical parts.
  • Made a parts list and checked the status. Will update from time to time.

  • Vertical vibration isolation bellows.
    • Firstly contacted with Mirapro but they cannot make the ones we are now using. I'll contact with NIPPON VALQUA INDUSTRIES, LTD.
  • Mirror status
    • OMMTs will arrive soon. OSTM will be ordered next FY. Perhaps need half a year.

Plan for coming weeks

  • Check hanging jig drawings.
  • Assemble the hanging jig.
  • Resume OSEM test.

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • Jan. 25: Monthly inspection of the cranes (11:30 - 12:30)
  • Feb 18: Black out of the Mozumi buildings

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • Temperature sensors

Travel Plans

  • Travel (Week of 1/22):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 1/29):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):