Size: 1788
Comment:
|
Size: 2687
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 18: | Line 18: |
[X-front] * Assembled the DP. Measured the weight of DP. * Mounted the DP onto the end plate. * Extended the EQ stop to the BF stage. * Assembled the release sensors for BF. * Replaced the receptacles in BF. * Assembled the blades for FR in BF. * Cabled to the connectors for LVDT, actuator, picomotor, stepper motor, and PT100 in BF. * Assembling the primary and secondaly coils for BF damper. * Repairing the side stoppers. * Opened the box for TFs and checked the blades. There were not broken blades. * Inspected the delivered items (ballast rings and D-sub connectors). [Y-end] * Started the evacuation of EYV chamber on 24th. The IP was moved by 0.3mm to T-direction. [X-end] * Checked flanges using alcohol. Leak points were not found. The present pressure is 8Pa. |
|
Line 19: | Line 39: |
* Open the top chamber and the cross tube. * Start the tuning of BF. |
Agenda/Minutes of the VIS Meeting on 2018/1/26
2018/1/26 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
- Type-A:
- Type-B:
Type-A (Takahashi)
Past week report
[X-front]
- Assembled the DP. Measured the weight of DP.
- Mounted the DP onto the end plate.
- Extended the EQ stop to the BF stage.
- Assembled the release sensors for BF.
- Replaced the receptacles in BF.
- Assembled the blades for FR in BF.
- Cabled to the connectors for LVDT, actuator, picomotor, stepper motor, and PT100 in BF.
- Assembling the primary and secondaly coils for BF damper.
- Repairing the side stoppers.
- Opened the box for TFs and checked the blades. There were not broken blades.
- Inspected the delivered items (ballast rings and D-sub connectors).
[Y-end]
- Started the evacuation of EYV chamber on 24th. The IP was moved by 0.3mm to T-direction.
[X-end]
- Checked flanges using alcohol. Leak points were not found. The present pressure is 8Pa.
Plan for coming weeks
- Open the top chamber and the cross tube.
- Start the tuning of BF.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Start ordering sequentially for mass products. --> Completed. And order processing end.
Preparation for assembly of mass products.--> Ongoing.
Plan for coming weeks
- Preparation for assembly of mass products.
- Adjustment and approval to vendors(Meeting on machine design etc).
Other site works
- Feb 18: Black out of the Mozumi buildings
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- bKAGRA phase 2 roadmap
Travel Plans
- Travel (Week of 1/29):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 2/5):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/2/2(Fri)