Size: 1481
Comment:
|
Size: 1780
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 34: | Line 34: |
*Preparation for assembly of mass products. --> Ongoing. *Adjustment and approval to vendors(Meeting on machine design etc). --> Completed. |
|
Line 35: | Line 40: |
*Preparation for assembly of mass products. *Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.). |
Agenda/Minutes of the VIS Meeting on 2018/2/2
2018/2/2 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
- Type-A:
- Type-B:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
*Preparation for assembly of mass products. --> Ongoing.
*Adjustment and approval to vendors(Meeting on machine design etc). --> Completed.
Plan for coming weeks
*Preparation for assembly of mass products.
*Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.).
Other site works
- Feb 18: Black out of the Mozumi buildings
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- Fragile blades
Travel Plans
- Travel (Week of 2/5):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 2/12):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/2/9(Fri)