Line 3: | Line 3: |
2018/2/2 13:30 - | 2018/2/2 13:30 - 14:40 |
Line 5: | Line 5: |
Participants: | Participants: Mark, Takahashi, Sato, Aso, Hirata, Tanaka, Fabian, Shoda, Ishizaki, Suzuki |
Line 13: | Line 13: |
* Type-A: | * Type-A: 0.5 week delay expected for BF |
Line 18: | Line 18: |
[X-front] * Assembled the side stoppers for DP and BF. * Assembled the LVDT coils for BF damper. The primary coils were attached on the cup. * Measured the weight of BF (105 kg). * Put the BF base onto the end plate and hooked the test wire to the receptacle. * Tuned the BF with additional compression (load 190.4kg, frequency 0.3Hz). * '''Check with CRY if 190kg is OK for CRY payload (Takahashi)''' * Checked the range of FR in the BF. The range was larger than the movable limit of keystone. * Checked the blades on TFs. There were not any cracks on the surface of the blades. [Y-end] * Release the support jack for the top chamber. The height of chamber was decreased by 2mm. * Removed the NIM chassis from the rack. |
|
Line 19: | Line 34: |
* Open the top chamber and the cross tube. * Install the DP and the BF into the chamber. |
|
Line 21: | Line 38: |
==== Past week report ==== ==== Plan for coming weeks ==== |
==== Report for week of 1/29 ==== * We moved the top filter intended for SR2 (#1) into the SR3 cleanbooth. * Unfortunately we noticed one of the blades had many small X-shaped stress fractures on the top surface (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4058|4058]]). * We moved the top filter entered for SR3 (#3) into the SRM cleanbooth and inspected the blades. Two had one smallish stress fracture each and one had a huge fracture and looks close to failing (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4061|4061]]). * We referred the BS OL. * We removed the BS tank lid and inspected the BS top filter blades. They seemed fine (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4073|4073]]). * Hirata-san received and washed some ferromagnetic disks for IM flags and other small parts. * Hirata-san moved the BF with the tilted keystone (#1) out of the cleanbooth in preparation for rebuilding. * Hirata-san placed the second order for payload parts, and an order for remachining of nuts for cable clamps on rods. * Fabian measured the gain of the ADC system (homework from the Commissioning Workshop). * Shoda-san revised the BS real-time model (and Izumi-san fixed a few compile errors and installed it). ==== Plan for week of 2/5 ==== * Enzo on vacation; all others at Kamioka. * - * Make in-air pico adapter cables. * Calibrate LVDT. * Test IM picos and BF yaw pico. * Test FR. * Install ballast mass in BF. * Build IRM around IM. ==== Plan for week of 2/13 ==== * No work Monday (建国記念の日の振替休日)<<BR>> * Enzo on vacation * Hirata-san at Mitaka Tue, Wed (to receive and wash parts). * All others at Kamioka. * - * Cable/test/adjust IM OSEMs. * Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw. ==== Plan for week of 2/19 ==== * Lift BF/... section and check total mass and balance. * Cable and test BF picos. * Add section of SS up to SF ring. * Bring in SF. * Add Cu segments to SF cap. * Hook BF/... section. * Route cables up to under SF. * Check/adjust total mass of BF/... section. ==== Vacation Info ==== * Enzo 1/30-2/19 (at Mitaka 1/29, part of 1/30). * Fabian 4/2-4/27 vacation (then gone). |
Line 49: | Line 108: |
* Incidents: | * Incidents: no incident |
Line 52: | Line 111: |
* Type-A: * Type-B: |
* Type-A: Crane work * Type-B: Crane work |
Line 58: | Line 117: |
* All the SR TF blades are bad -> we will replace them * BS and ITM TF blades seem to be OK (no crack found) * Takahashi will ask G&M the history of those blades (is there any difference between the SR blades and others ?) * For ITM TF, we do not have enough number of blades from the beginning. We need at least 3 more blades. * We will make the following numbers of blades: * SR: 15 (9 necessary) * BS: 6 (3 necessary if we replace them) * Type-A: 6 (3 necessary) * How to safely take out the damaged blades from the TFs ? * We need to wear protective gear (Aso will look for them) * We will clamp the blade (using C-clamps) to the jig around the large crack to prevent sudden break. Hirata will select suitable C-clamps. * Once the blades are moved to the work bench, we will cover everything in a plastic box before releasing the stress. |
|
Line 61: | Line 133: |
* Takahashi: * Okutomi: * Sato: * Ishizaki: * Mark: * Fabian: * Hirata: |
* Takahashi: 7-9 * Okutomi: 5 - 9 * Sato: 6-9 * Ishizaki: 7-9 * Mark: 5-9 * Fabian: 5-9 * Hirata: 5-9 |
Line 73: | Line 145: |
* Kozu (ICRR): | * Kozu (ICRR): 5-9 |
Line 78: | Line 150: |
* Takahashi: * Okutomi: * Sato: * Ishizaki: * Mark: * Fabian: * Hirata: |
* Takahashi: 13-16 * Okutomi: 13-16 * Sato: 13-16 * Ishizaki: 13-16 * Mark: 13-16 * Fabian: 13-16 * Hirata: 15-16 |
Line 90: | Line 162: |
* Kozu (ICRR): | * Kozu (ICRR): 13-16 |
Agenda/Minutes of the VIS Meeting on 2018/2/2
2018/2/2 13:30 - 14:40
Participants: Mark, Takahashi, Sato, Aso, Hirata, Tanaka, Fabian, Shoda, Ishizaki, Suzuki
Progress report
Schedule Chart
Type-A : (PDF/MPP)
- Type-A: 0.5 week delay expected for BF
- Type-B:
Type-A (Takahashi)
Past week report
[X-front]
- Assembled the side stoppers for DP and BF.
- Assembled the LVDT coils for BF damper. The primary coils were attached on the cup.
- Measured the weight of BF (105 kg).
- Put the BF base onto the end plate and hooked the test wire to the receptacle.
- Tuned the BF with additional compression (load 190.4kg, frequency 0.3Hz).
Check with CRY if 190kg is OK for CRY payload (Takahashi)
- Checked the range of FR in the BF. The range was larger than the movable limit of keystone.
- Checked the blades on TFs. There were not any cracks on the surface of the blades.
[Y-end]
- Release the support jack for the top chamber. The height of chamber was decreased by 2mm.
- Removed the NIM chassis from the rack.
Plan for coming weeks
- Open the top chamber and the cross tube.
- Install the DP and the BF into the chamber.
Type B (Mark)
Report for week of 1/29
- We moved the top filter intended for SR2 (#1) into the SR3 cleanbooth.
Unfortunately we noticed one of the blades had many small X-shaped stress fractures on the top surface (klog 4058).
We moved the top filter entered for SR3 (#3) into the SRM cleanbooth and inspected the blades. Two had one smallish stress fracture each and one had a huge fracture and looks close to failing (klog 4061).
- We referred the BS OL.
We removed the BS tank lid and inspected the BS top filter blades. They seemed fine (klog 4073).
- Hirata-san received and washed some ferromagnetic disks for IM flags and other small parts.
- Hirata-san moved the BF with the tilted keystone (#1) out of the cleanbooth in preparation for rebuilding.
- Hirata-san placed the second order for payload parts, and an order for remachining of nuts for cable clamps on rods.
- Fabian measured the gain of the ADC system (homework from the Commissioning Workshop).
- Shoda-san revised the BS real-time model (and Izumi-san fixed a few compile errors and installed it).
Plan for week of 2/5
- Enzo on vacation; all others at Kamioka.
- -
- Make in-air pico adapter cables.
- Calibrate LVDT.
- Test IM picos and BF yaw pico.
- Test FR.
- Install ballast mass in BF.
- Build IRM around IM.
Plan for week of 2/13
No work Monday (建国記念の日の振替休日)
- Enzo on vacation
- Hirata-san at Mitaka Tue, Wed (to receive and wash parts).
- All others at Kamioka.
- -
- Cable/test/adjust IM OSEMs.
- Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
Plan for week of 2/19
- Lift BF/... section and check total mass and balance.
- Cable and test BF picos.
- Add section of SS up to SF ring.
- Bring in SF.
- Add Cu segments to SF cap.
- Hook BF/... section.
- Route cables up to under SF.
- Check/adjust total mass of BF/... section.
Vacation Info
- Enzo 1/30-2/19 (at Mitaka 1/29, part of 1/30).
- Fabian 4/2-4/27 vacation (then gone).
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
*Preparation for assembly of mass products. --> Ongoing.
*Adjustment and approval to vendors(Meeting on machine design etc). --> Completed.
Plan for coming weeks
*Preparation for assembly of mass products.
*Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.).
Other site works
- Feb 18: Black out of the Mozumi buildings
Safety
- Incidents: no incident
- Foreseen risks
- Type-A: Crane work
- Type-B: Crane work
- Type-Bp:
Discussion
- Fragile blades
All the SR TF blades are bad -> we will replace them
- BS and ITM TF blades seem to be OK (no crack found)
Takahashi will ask G&M the history of those blades (is there any difference between the SR blades and others ?)
- For ITM TF, we do not have enough number of blades from the beginning. We need at least 3 more blades.
- We will make the following numbers of blades:
- SR: 15 (9 necessary)
- BS: 6 (3 necessary if we replace them)
- Type-A: 6 (3 necessary)
- How to safely take out the damaged blades from the TFs ?
- We need to wear protective gear (Aso will look for them)
- We will clamp the blade (using C-clamps) to the jig around the large crack to prevent sudden break. Hirata will select suitable C-clamps.
- Once the blades are moved to the work bench, we will cover everything in a plastic box before releasing the stress.
Travel Plans
- Travel (Week of 2/5):
- Takahashi: 7-9
- Okutomi: 5 - 9
- Sato: 6-9
- Ishizaki: 7-9
- Mark: 5-9
- Fabian: 5-9
- Hirata: 5-9
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR): 5-9
- Arai (ICRR):
- Travel (Week of 2/12):
- Takahashi: 13-16
- Okutomi: 13-16
- Sato: 13-16
- Ishizaki: 13-16
- Mark: 13-16
- Fabian: 13-16
- Hirata: 15-16
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR): 13-16
- Arai (ICRR):
Next meeting
On 2018/2/9(Fri)