Line 13: Line 13:
 * Type-A:  * Type-A: 0.5 week delay expected for BF
Line 25: Line 25:
   * '''Check with CRY if 190kg is OK for CRY payload'''    * '''Check with CRY if 190kg is OK for CRY payload (Takahashi)'''
Line 108: Line 108:
 * Incidents:  * Incidents: no incident
Line 111: Line 111:
  * Type-A:
  * Type-B:
  * Type-A: Crane work
  * Type-B: Crane work

Agenda/Minutes of the VIS Meeting on 2018/2/2

2018/2/2 13:30 - 14:40

Participants: Mark, Takahashi, Sato, Aso, Hirata, Tanaka, Fabian, Shoda, Ishizaki, Suzuki

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF,MPP)

  • Type-A: 0.5 week delay expected for BF
  • Type-B:

Type-A (Takahashi)

Past week report

[X-front]

  • Assembled the side stoppers for DP and BF.
  • Assembled the LVDT coils for BF damper. The primary coils were attached on the cup.
  • Measured the weight of BF (105 kg).
  • Put the BF base onto the end plate and hooked the test wire to the receptacle.
  • Tuned the BF with additional compression (load 190.4kg, frequency 0.3Hz).
    • Check with CRY if 190kg is OK for CRY payload (Takahashi)

  • Checked the range of FR in the BF. The range was larger than the movable limit of keystone.
  • Checked the blades on TFs. There were not any cracks on the surface of the blades.

[Y-end]

  • Release the support jack for the top chamber. The height of chamber was decreased by 2mm.
  • Removed the NIM chassis from the rack.

Plan for coming weeks

  • Open the top chamber and the cross tube.
  • Install the DP and the BF into the chamber.

Type B (Mark)

Report for week of 1/29

  • We moved the top filter intended for SR2 (#1) into the SR3 cleanbooth.
  • Unfortunately we noticed one of the blades had many small X-shaped stress fractures on the top surface (klog 4058).

  • We moved the top filter entered for SR3 (#3) into the SRM cleanbooth and inspected the blades. Two had one smallish stress fracture each and one had a huge fracture and looks close to failing (klog 4061).

  • We referred the BS OL.
  • We removed the BS tank lid and inspected the BS top filter blades. They seemed fine (klog 4073).

  • Hirata-san received and washed some ferromagnetic disks for IM flags and other small parts.
  • Hirata-san moved the BF with the tilted keystone (#1) out of the cleanbooth in preparation for rebuilding.
  • Hirata-san placed the second order for payload parts, and an order for remachining of nuts for cable clamps on rods.
  • Fabian measured the gain of the ADC system (homework from the Commissioning Workshop).
  • Shoda-san revised the BS real-time model (and Izumi-san fixed a few compile errors and installed it).

Plan for week of 2/5

  • Enzo on vacation; all others at Kamioka.
  • -
  • Make in-air pico adapter cables.
  • Calibrate LVDT.
  • Test IM picos and BF yaw pico.
  • Test FR.
  • Install ballast mass in BF.
  • Build IRM around IM.

Plan for week of 2/13

  • No work Monday (建国記念の日の振替休日)

  • Enzo on vacation
  • Hirata-san at Mitaka Tue, Wed (to receive and wash parts).
  • All others at Kamioka.
  • -
  • Cable/test/adjust IM OSEMs.
  • Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.

Plan for week of 2/19

  • Lift BF/... section and check total mass and balance.
  • Cable and test BF picos.
  • Add section of SS up to SF ring.
  • Bring in SF.
  • Add Cu segments to SF cap.
  • Hook BF/... section.
  • Route cables up to under SF.
  • Check/adjust total mass of BF/... section.

Vacation Info

  • Enzo 1/30-2/19 (at Mitaka 1/29, part of 1/30).
  • Fabian 4/2-4/27 vacation (then gone).

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

*Preparation for assembly of mass products. --> Ongoing.

*Adjustment and approval to vendors(Meeting on machine design etc). --> Completed.

Plan for coming weeks

*Preparation for assembly of mass products.

*Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.).

Other site works

  • Feb 18: Black out of the Mozumi buildings

Safety

  • Incidents: no incident
  • Foreseen risks
    • Type-A: Crane work
    • Type-B: Crane work
    • Type-Bp:

Discussion

  • Fragile blades

Travel Plans

  • Travel (Week of 2/5):
    • Takahashi: 7-9
    • Okutomi: 5 - 9
    • Sato: 6-9
    • Ishizaki: 7-9
    • Mark: 5-9
    • Fabian: 5-9
    • Hirata: 5-9
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR): 5-9
    • Arai (ICRR):
  • Travel (Week of 2/12):
    • Takahashi: 13-16
    • Okutomi: 13-16
    • Sato: 13-16
    • Ishizaki: 13-16
    • Mark: 13-16
    • Fabian: 13-16
    • Hirata: 15-16
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR): 13-16
    • Arai (ICRR):

Next meeting

On 2018/2/9(Fri)

KAGRA/Subgroups/VIS/VISMinutes20180202 (last edited 2018-02-02 16:13:39 by YoichiAso)