Agenda/Minutes of the VIS Meeting on 2018/4/13

2018/4/13 13:30 - 15:20

Participants: Mark, Takahashi, Ishizaki, Aso, Hirata, Ohishi, Sato, Simon, Shoda, Tanaka, Enzo, Fujii, Okutomi, Tanioka

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[X-front]

Plan for coming weeks

[X-front]

Type B (Mark)

Report for week of 4/9

Plan for week of 4/16

Plan for week of 4/23

Plan for week of 4/30

To-Do Lists, Schedule

Vacation Info

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

Discussion

Yaw fishing rod for the top filter

Composite SRM design (Shoda)

Use HR side of the SRM 2-inch mirror, and do not have any mirror on the AR side. The coupling rate from the transverse/vertical motion to the beam angle due to the curvature would be about 1 urad /1 mm mirror motion.

[A/I] Check whether Oplev bread boards can be fixed at the AR side of the outer frame. (Simon) [A/I] Double check the coupling rate from the transverse/vertical motion to the beam spot due to the curvature. (Aso)

- Inner duct: Make it wider as much as possible, and insert black-coated pipe.

[A/I] Proceed the design of the metal mass and the inner pipe. (Shoda)

- Mirror holder: Discussion on going. Gluing is preferable if possible, because it is easier to manufacture. Possible problem is

LVDT drivers

Travel Plans

Next meeting

On 2018/4/20(Fri)