Line 31: Line 31:
 *The problem of P 0 was found to be due to a failure of U 25 (THAT 1646).
   *I replaced the U25 and completed the repair.
   *I could not confirm the problem of P3 being noisy in this environment.
   *It is necessary to check again in KAGRA side.
   *[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0082/E1808252/001/Report%20on%20failure%20diagnosis%20and%20repair%20of%20LVDT%20driver%20180517.pdf | PDF(JGW-E1808252)]]
Line 32: Line 38:
 *I'm working on designing and researching them.

Agenda/Minutes of the VIS Meeting on 2018/5/25

2018/5/25 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

LVDT Driver (Tanaka)

Past week report

  • The problem of P 0 was found to be due to a failure of U 25 (THAT 1646).
    • I replaced the U25 and completed the repair.
    • I could not confirm the problem of P3 being noisy in this environment.
    • It is necessary to check again in KAGRA side.
    • PDF(JGW-E1808252)

Plan for coming weeks

  • I'm working on designing and researching them.

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 5/28):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 6/4):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/6/1(Fri)

KAGRA/Subgroups/VIS/VISMinutes20180525 (last edited 2018-05-25 15:33:26 by YoichiAso)