Line 46: | Line 46: |
* Transport the DP from the X-end. * Start the assembly of DP and BF damper. |
* Transport the DP from the X-end to the Y-front. * Start the assembly of DP and BF damper in Y-front. |
Line 51: | Line 51: |
* LBB ballast masses are ordered. Will be delivered by 6/23. * SRM 2D drawing is in preparation. |
|
Line 83: | Line 86: |
* Order of high power coil drivers |
Agenda/Minutes of the VIS Meeting on 2018/5/25
2018/5/25 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
(after 14th May)
[X-front]
- Swapped the IP. The wrong IP (for SR) was removed and packed.
- Installed the right IP into the clean booth and combined it with the TF. One threaded hole to fix the IP leg was not good, but repaired by tapping.
- Installed the PI into the top chamber.
- Cabled from the PI to the feedthroughs.
- Calibrated the horizontal LVDSs for the IP.
- Put the ballast rings and three ACC units on the IP.
- Adjusted the horizontal position of IP, the vertical position of TF, and the yaw position of BF damper.
- Measured the spectrum of IP by the LVDT. The lowest mode frequency was 50mHz.
- Attached the LVDT coils onto the BF and the support ring. Confirmed the signals with the driver.
- Checked the keystone height of F1-F3. Added the ballast mass of 276g on the BF.
- Fastened the screws for the feedthrough flanges.
- Cabled for the ACCs.
- The PEEK gender changer used on the ACC unit was flip connector like the feedthrough. The pre-amplifier in the ACC2 unit was broken.
- Checked the signals of ACC1-3 using the new cables. They worked.
- Attached the adjustment screw for the yaw rotation of receptacle in the TF.
- Closed the top chamber. The installation of Type-A tower was finished except control part.
[Y-front]
- Started the preparation of the site.
- Cleaned the booth. Set the SUS sheets on the floor. Transported some items.
[Maraging blade]
- The cutting of 26 blades was finished and delivered on 21th.
- The aging was finished and delivered today (25th).
- The 12 blades will be coated in the next week.
Plan for coming weeks
- Transport the DP from the X-end to the Y-front.
- Start the assembly of DP and BF damper in Y-front.
Type B (Mark)
Past week report
- LBB ballast masses are ordered. Will be delivered by 6/23.
- SRM 2D drawing is in preparation.
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
LVDT Driver (Tanaka)
Past week report
- The problem of P 0 was found to be due to a failure of U 25 (THAT 1646).
- I replaced the U25 and completed the repair.
- I could not confirm the problem of P3 being noisy in this environment.
- It is necessary to check again in KAGRA side.
Report on failure diagnosis and repair of LVDT driver (JGW-E1808252)PDF
Plan for coming weeks
- I'm working on designing and researching them.
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- Order of high power coil drivers
Travel Plans
- Travel (Week of 5/28):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 6/4):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/6/1(Fri)