Participants: | Participants: Takahashi, Sato, Barton, Tapia, Hirata, Kozu, Terrence, Ohishi, Tanioka, Tanaka, Fujii, Okutomi, Shoda, Ishizaki, Tanak(ICRR) |
Line 17: | Line 17: |
[Y-front] * Mounted the BF onto the EQ stop. The DP was suspended from the BF. * Tuned the BF. Compressed the all five blades. The tuned frequency was 0.24Hz at 198kg. * Modified the FR for BF. The fixing point of blade was changed. The FR can cover the full range of keystone. * Calibrated the LVDT for BF. * Made the short cables for BF damper. * Assembled the end plate for F3. * Extended the EQ stop to the F3 stage. Attached the support plate for the BF damper. * Assembled the FR for F3 with the new blades. * Assembled the connector plates for F3. Attached them to the cup. * Cabled for the LVDT-Actuator and the stepping motor for F3. * Measured the weight of F3. It was 82.9kg. * Mounted the F3 onto the EQ stop. The BF was suspended from the F3. * Cabled between the BF and the F3. * Tuned the F3. The tuned frequency was 0.31Hz with the additional load of 6kg. * Checked the range of FR for BF. The FR can cover the full range of keystone. [X-front] * Set up the analog drivers in the rack. * Checked the dimension of distance between the beam axis and the cross tube. |
|
Line 18: | Line 40: |
* Calibrate the LVDT for F3. * Go to the F2 stage. * Tune the TF in X-front. |
|
Line 20: | Line 45: |
==== Past week report ==== ==== Plan for coming weeks ==== |
==== Report for week of 6/11 ==== * Mark fixed some channels displaying white on the BS MEDM screens due to issues from splitting the model. * Enzo redid the SR3 BIO connections to match the now-working BS setup. He also fixed PR2, which had a similar problem. * Enzo replaced LPCDs with HPCDs in the SR3. * Hirata-san installed the cable clamps and Cu segments on the SF cap. * Hirata-san and Kozu-kun continued tuning the filter in PI #3. Unfortunately it seems to be rather weaker than expected, and we have not found a compression setting that gives a good frequency. We may have to use tricks like reducing the number of Cu segments on the SF (or using Al ones) to save weight. * Mark, Enzo and Terrence suspended the BF/... section from the SF, routed all the cables from the BF/... stages up around the BF, via the SF-BF margin rod to the bottom of the SF, and got the hanging section aligned for TFs. * Enzo cabled and tested the SF LVDT (but not yet the SF FR). * Mark and Enzo released an update to the BS Circuit Diagram D1503600-v15 with corrections to the BIO and other sections. ==== Plan for week of 6/18 ==== * Mark, Enzo, Hirata-san, Kozu-kun, Terrence at Kamioka Mon-Fri. * -- * Receive second and third sets of LBB damper rings. * Take TFs. * Cable, test SF LVDT and FR. * Add calculated ballast to SF. * Finish tuning F0 #3 for SR3. * Park F0 #1 (for SR2) in top of SR3 assembly frame. * Move F0 #3 behind SR3. * Move F0 #1 to "factory" area (in front of SRM) and start rebuild. * Install PI. * Suspend SF/... section. * Lots of cabling. ==== Plan for week of 6/25 ==== * Mark, Enzo, Hirata-san, Kozu-kun, Terrence at Kamioka Mon-Fri. ==== To-Do Lists, Schedule ==== * [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]] * [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|JGW-L1807779 Type B Schedule (SR)]] ==== Vacation Info ==== |
Line 25: | Line 82: |
* Worked on Oplev diagonalization for PR2 and PR3. * Coil balance of PR2 optic was adjusted * PR3 IM and BF sensor matrices were also diagonalized. * Working on decay time (w/ damping) measurement on PR3. |
|
Line 29: | Line 90: |
* Thanks to Tanioka-san and Nagano-san (NICT), we have finished parts replacement of IMMT1. * We have replaced stainless screws in the intermediate mass with non-magnetic screws. * Measured transfer functions of length, pitch, and yaw and found no problem. |
|
Line 30: | Line 96: |
* Order some parts of OMMT. |
|
Line 36: | Line 104: |
* Power line replacement is planed on 26th June. | |
Line 41: | Line 110: |
* Type-A: * Type-B: |
* Type-A: Crane work. * Type-B: Crane work. |
Line 46: | Line 115: |
* Commissioning of X-arm in autum. The commissioning team is requiring the lift up of both ITMX and ETMX by ~ 10 mm. It is difficult to lift up the ETMX by the FR more than several mm due to the bistable problem in the F2. * Tuning of TF for SR3. Optimal point lower than 0.3Hz was not found in the compression of 18~30mm. The lowest frequency was 0.4Hz at 245kg. Try to find a point higher than 0.5Hz at the load larger than 255kg again. |
|
Line 49: | Line 126: |
* Takahashi: * Okutomi: * Sato: |
* Takahashi: 18-22 * Okutomi: 18-22 * Sato: 18-22 |
Line 53: | Line 130: |
* Mark: * Hirata: * Enzo: |
* Mark: 18-22 * Hirata: 18-22 * Enzo: 18-22 |
Line 61: | Line 138: |
* Kozu (ICRR): | * Kozu (ICRR): 18-22 |
Line 63: | Line 140: |
* Terrence: | * Terrence: 18-22 |
Line 67: | Line 144: |
* Takahashi: | * Takahashi: 25-29 |
Line 69: | Line 146: |
* Sato: | * Sato: 25-29 |
Line 71: | Line 148: |
* Mark: * Hirata: * Enzo: |
* Mark: 25-29 * Hirata: 25-29 * Enzo: 25-29 |
Line 76: | Line 153: |
* Fujii: | * Fujii: 25-29 |
Line 79: | Line 156: |
* Kozu (ICRR): | * Kozu (ICRR): 25-29 |
Line 81: | Line 158: |
* Terrence: | * Terrence: 25-29 |
Agenda/Minutes of the VIS Meeting on 2018/6/15
2018/6/15 13:30 -
Participants: Takahashi, Sato, Barton, Tapia, Hirata, Kozu, Terrence, Ohishi, Tanioka, Tanaka, Fujii, Okutomi, Shoda, Ishizaki, Tanak(ICRR)
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
[Y-front]
- Mounted the BF onto the EQ stop. The DP was suspended from the BF.
- Tuned the BF. Compressed the all five blades. The tuned frequency was 0.24Hz at 198kg.
- Modified the FR for BF. The fixing point of blade was changed. The FR can cover the full range of keystone.
- Calibrated the LVDT for BF.
- Made the short cables for BF damper.
- Assembled the end plate for F3.
- Extended the EQ stop to the F3 stage. Attached the support plate for the BF damper.
- Assembled the FR for F3 with the new blades.
- Assembled the connector plates for F3. Attached them to the cup.
- Cabled for the LVDT-Actuator and the stepping motor for F3.
- Measured the weight of F3. It was 82.9kg.
- Mounted the F3 onto the EQ stop. The BF was suspended from the F3.
- Cabled between the BF and the F3.
- Tuned the F3. The tuned frequency was 0.31Hz with the additional load of 6kg.
- Checked the range of FR for BF. The FR can cover the full range of keystone.
[X-front]
- Set up the analog drivers in the rack.
- Checked the dimension of distance between the beam axis and the cross tube.
Plan for coming weeks
- Calibrate the LVDT for F3.
- Go to the F2 stage.
- Tune the TF in X-front.
Type B (Mark)
Report for week of 6/11
- Mark fixed some channels displaying white on the BS MEDM screens due to issues from splitting the model.
- Enzo redid the SR3 BIO connections to match the now-working BS setup. He also fixed PR2, which had a similar problem.
- Enzo replaced LPCDs with HPCDs in the SR3.
- Hirata-san installed the cable clamps and Cu segments on the SF cap.
- Hirata-san and Kozu-kun continued tuning the filter in PI #3. Unfortunately it seems to be rather weaker than expected, and we have not found a compression setting that gives a good frequency. We may have to use tricks like reducing the number of Cu segments on the SF (or using Al ones) to save weight.
- Mark, Enzo and Terrence suspended the BF/... section from the SF, routed all the cables from the BF/... stages up around the BF, via the SF-BF margin rod to the bottom of the SF, and got the hanging section aligned for TFs.
- Enzo cabled and tested the SF LVDT (but not yet the SF FR).
- Mark and Enzo released an update to the BS Circuit Diagram D1503600-v15 with corrections to the BIO and other sections.
Plan for week of 6/18
- Mark, Enzo, Hirata-san, Kozu-kun, Terrence at Kamioka Mon-Fri.
- --
- Receive second and third sets of LBB damper rings.
- Take TFs.
- Cable, test SF LVDT and FR.
- Add calculated ballast to SF.
- Finish tuning F0 #3 for SR3.
- Park F0 #1 (for SR2) in top of SR3 assembly frame.
- Move F0 #3 behind SR3.
- Move F0 #1 to "factory" area (in front of SRM) and start rebuild.
- Install PI.
- Suspend SF/... section.
- Lots of cabling.
Plan for week of 6/25
- Mark, Enzo, Hirata-san, Kozu-kun, Terrence at Kamioka Mon-Fri.
To-Do Lists, Schedule
Vacation Info
Type-Bp (Shoda)
Past week report
- Worked on Oplev diagonalization for PR2 and PR3.
- Coil balance of PR2 optic was adjusted
- PR3 IM and BF sensor matrices were also diagonalized.
- Working on decay time (w/ damping) measurement on PR3.
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
- Thanks to Tanioka-san and Nagano-san (NICT), we have finished parts replacement of IMMT1.
- We have replaced stainless screws in the intermediate mass with non-magnetic screws.
- Measured transfer functions of length, pitch, and yaw and found no problem.
Plan for coming weeks
- Order some parts of OMMT.
LVDT Driver (Tanaka)
Past week report
Plan for coming weeks
Other site works
- Power line replacement is planed on 26th June.
Safety
- Incidents:
- Foreseen risks
- Type-A: Crane work.
- Type-B: Crane work.
- Type-Bp:
Discussion
- Commissioning of X-arm in autum.
The commissioning team is requiring the lift up of both ITMX and ETMX by ~ 10 mm. It is difficult to lift up the ETMX by the FR more than several mm due to the bistable problem in the F2.
- Tuning of TF for SR3.
Optimal point lower than 0.3Hz was not found in the compression of 18~30mm. The lowest frequency was 0.4Hz at 245kg. Try to find a point higher than 0.5Hz at the load larger than 255kg again.
Travel Plans
- Travel (Week of 6/18):
- Takahashi: 18-22
- Okutomi: 18-22
- Sato: 18-22
- Ishizaki:
- Mark: 18-22
- Hirata: 18-22
- Enzo: 18-22
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR): 18-22
- Arai (ICRR):
- Terrence: 18-22
- Travel (Week of 6/25):
- Takahashi: 25-29
- Okutomi:
- Sato: 25-29
- Ishizaki:
- Mark: 25-29
- Hirata: 25-29
- Enzo: 25-29
- Shoda:
- Ohishi:
- Fujii: 25-29
- Tanioka:
- Tanaka:
- Kozu (ICRR): 25-29
- Arai (ICRR):
- Terrence: 25-29
Next meeting
On 2018/6/22(Fri)