Agenda/Minutes of the VIS Meeting on 2018/6/15

2018/6/15 13:30 -

Zoom Meeting

Participants: Takahashi, Sato, Barton, Tapia, Hirata, Kozu, Terrence, Ohishi, Tanioka, Tanaka, Fujii, Okutomi, Shoda, Ishizaki, Tanak(ICRR)

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[Y-front]

[X-front]

Plan for coming weeks

Type B (Mark)

Report for week of 6/11

Plan for week of 6/18

Plan for week of 6/25

To-Do Lists, Schedule

Vacation Info

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

LVDT Driver (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

Discussion

The commissioning team is requiring the lift up of both ITMX and ETMX by ~ 10 mm. It is difficult to lift up the ETMX by the FR more than several mm due to the bistable problem in the F2.

Optimal point lower than 0.3Hz was not found in the compression of 18~30mm. The lowest frequency was 0.4Hz at 245kg. Try to find a point higher than 0.5Hz at the load larger than 255kg again.

Travel Plans

Next meeting

On 2018/6/22(Fri)