Size: 1868
Comment:
|
Size: 2630
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
2018/9/21 13:30 - | 2018/9/21 13:30 - 14:50 |
Line 7: | Line 7: |
Participants: | Participants:Mark, Fabian, Kozu, Aso, Ohishi, Panwei, Hirata, Tanaka, Takahashi, Sato |
Line 19: | Line 19: |
0471365107 | |
Line 22: | Line 21: |
* The orientation of the PRM mirror was adjusted to reflect the input beam back to the IFI * As a result, the IM OSEM went out of the range * We also found that the BF keystone was sitting on the EQ stop * We lifted the BF keystone with the fishing rod * Then we adjusted the OSEM positions, by entering the chamber, to get them back to the working range. * Now the PRM is in a good alignment state. * The transfer function measurement shows it is healthy. * Related klog entries [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6192|6192]] [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6215|6215]] |
|
Line 43: | Line 52: |
* Incidents: | * Incidents: no incident |
Line 47: | Line 56: |
* Type-B: | * Type-B: Crane work |
Line 54: | Line 63: |
* Takahashi: | * Takahashi: 26-28 |
Line 56: | Line 65: |
* Sato: * Lucia: * Fabian: * Mark: * Hirata: |
* Sato: 25-28 * Lucia: 25-28 * Fabian: 25-28 * Mark: 25-28 * Hirata: 25-28 |
Line 64: | Line 73: |
* Fujii: | * Fujii: 25-28 |
Line 71: | Line 80: |
* Takahashi: | * Takahashi: 1-5 |
Line 73: | Line 82: |
* Sato: * Lucia: * Fabian * Mark: * Hirata: |
* Sato: 1-5 * Lucia: 1-5 * Fabian: 1-5 * Mark: 1-5 * Hirata: 1-5 |
Line 81: | Line 90: |
* Fujii: | * Fujii: 2-5 |
Line 87: | Line 96: |
Agenda/Minutes of the VIS Meeting on 2018/9/21
2018/9/21 13:30 - 14:50
Participants:Mark, Fabian, Kozu, Aso, Ohishi, Panwei, Hirata, Tanaka, Takahashi, Sato
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- The orientation of the PRM mirror was adjusted to reflect the input beam back to the IFI
- As a result, the IM OSEM went out of the range
- We also found that the BF keystone was sitting on the EQ stop
- We lifted the BF keystone with the fishing rod
- Then we adjusted the OSEM positions, by entering the chamber, to get them back to the working range.
- Now the PRM is in a good alignment state.
- The transfer function measurement shows it is healthy.
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Made a Schedule
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
- JGW-S1403045 Assembled Chassis of the KAGRA LVDT Driver
- Received to MTK(NAOJ) for Repair 2018/09/18
- I had identified a broken board. And S1403073 removed.
- Returned to Kamioka(Mozumi) 2018/09/19.
- Waiting for parts(for repair) order and arrival for S1403073.
Plan for coming weeks
- I'll take a summer vacation.
Other site works
Safety
- Incidents: no incident
- Foreseen risks
- Type-A:
- Type-B: Crane work
Discussion
- LVDT driver tally again
Travel Plans
- Travel (Week of 9/24):
- Takahashi: 26-28
- Okutomi:
- Sato: 25-28
- Lucia: 25-28
- Fabian: 25-28
- Mark: 25-28
- Hirata: 25-28
- Enzo:
- Shoda:
- Ohishi:
- Fujii: 25-28
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 10/1):
- Takahashi: 1-5
- Okutomi:
- Sato: 1-5
- Lucia: 1-5
- Fabian: 1-5
- Mark: 1-5
- Hirata: 1-5
- Enzo:
- Shoda:
- Ohishi:
- Fujii: 2-5
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/9/28(Fri)