Agenda/Minutes of the VIS Meeting on 2018/9/21
2018/9/21 13:30 - 14:50
Participants:Mark, Fabian, Kozu, Aso, Ohishi, Panwei, Hirata, Tanaka, Takahashi, Sato
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
[X-front]
- Opened the BF cup to check the status of FR.
- Found the deformed bracket to fix the FR blade onto the keystone.
- The keystone dropped to the lower limit due to the deformation.
- The FR tried to pull up the keystone, but the FR could not pull even though the slider reached at the upper limit.
- The slider was tilted and stacked by the asymmetry of dual blades due to the deformation.
[X-end]
- Unhooked the wires from the receptacles.
- Disconnected the in-vacuum cables from the feedthroughs.
- Dismounted the PI from the top chamber.
- Replaced the actuator coil for TF.
- Mounted the PI onto the top chamber.
- Hooked the wires to the receptacles.
- Connected the in-vacuum cables to the feedthroughs.
- Adjusted the height of BF.
- Calibrated the LVDT for TF.
Plan for coming weeks
[Y-front]
- Test of the yaw FR for the TF.
[Y-end]
- Assembly of the geophone pods and installation.
[X-front]
- Procurement of parts for the BF FR.
[X-end]
- Closing of the chambers completely for the evacuation.
Type B (Mark)
Report for week of 9/17
- Monday 9/17 was holiday.
- We optimized the trim mass on the SF to get more balance torque with less total mass. We now have a reserve of 480 g for the yaw pico.
- We set the SF damper gap to 6 mm.
- We set the SR2 pitch with the optic lever, aligned the IRM, and set all the OSEMs to have good clearance and midrange output.
- We locked the SR2 suspension, craned it into the tank and hooked the LBB damper rings (but not the LBB yet).
- With help from Ohishi-san, we removed the First Contact from SR2.
- Mark did an audit of all the electronics boxes and updated the item list and S-number file cards on JGWDoc.
- Mark added some thin arc weights to the inventory and finalized the number of various types to order (8*38 mm + 9*10 mm).
- Panwei copied control filters over from the SR3.
Plan for week of 9/24
- Monday 9/24 is holiday (Autumn Equinox).
- Mark, Hirata-san, Fabian, Panwei at Kamioka Tue-Fri.
SR2
- Move SR2 in-air cables.
- Unlock and realign suspension.
SRM
- Set pitch of SRM and RM, tighten clamps, remove winch system.
- Weigh IM/... section.
- Build up SS to BF level.
- Add BF.
- Suspend IM and tweak height/balance.
Plan for week of 10/1
- Mark, Hirata-san, Fabian, Panwei at Kamioka Mon-Fri.
SRM
- Cable/test BF.
- Install IRM.
- Install/cable/test IM OSEMs.
Plan for week of 10/8
- Monday 10/8 is Sports Day.
- Enzo returns Tuesday 10/9.
- Mark and Terrence (plus TBD) at Kamioka Mon-Fri.
- Enzo, Hirata-san, Fabian and Panwei at Kamioka Tue-Fri.
SR2/SR3
- Terrence to set up LEN half of SR3 OL and, time permitting, TILT and LEN for SR2.
SRM
- Continue installation.
To-Do Lists, Schedule
Vacation/Visitor Info
- Enzo: 9/15 through 10/8 vacation in Chile.
- Terrence: 10/8-12, 10/29-11/2 at Kamioka.
Type-Bp (Shoda)
Past week report
- The orientation of the PRM mirror was adjusted to reflect the input beam back to the IFI
- As a result, the IM OSEM went out of the range
- We also found that the BF keystone was sitting on the EQ stop
- We lifted the BF keystone with the fishing rod
- Then we adjusted the OSEM positions, by entering the chamber, to get them back to the working range.
- Now the PRM is in a good alignment state.
- The transfer function measurement shows it is healthy.
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Made a Schedule
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
- JGW-S1403045 Assembled Chassis of the KAGRA LVDT Driver
- Received to MTK(NAOJ) for Repair 2018/09/18
- I had identified a broken board. And S1403073 removed.
- Returned to Kamioka(Mozumi) 2018/09/19.
- Waiting for parts(for repair) order and arrival for S1403073.
Plan for coming weeks
- I'll take a summer vacation.
Other site works
Safety
- Incidents: no incident
- Foreseen risks
- Type-A:
- Type-B: Crane work
Discussion
- LVDT driver tally again
Travel Plans
- Travel (Week of 9/24):
- Takahashi: 26-28
- Okutomi:
- Sato: 25-28
- Lucia: 25-28
- Fabian: 25-28
- Mark: 25-28
- Hirata: 25-28
- Enzo:
- Shoda:
- Ohishi:
- Fujii: 25-28
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 10/1):
- Takahashi: 1-5
- Okutomi:
- Sato: 1-5
- Lucia: 1-5
- Fabian: 1-5
- Mark: 1-5
- Hirata: 1-5
- Enzo:
- Shoda:
- Ohishi:
- Fujii: 2-5
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/9/28(Fri)