Size: 1533
Comment:
|
Size: 2252
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 14: | Line 14: |
[Y-front] * Removed the secondary coils for BF damper. Opened the cup. * Removed the old parts to fix the FR blades, then the upper blade was broken (cut off). * Removed the FR blades. * Attached the new parts onto the keystone with the new blades. * Tuned the BF. * Checked the range of FR. I was 69 +/- 3 mm in the height of keystone. * Closed the cup. The optimal load was changed. Finally the additional weight for DP was 1.2kg. * Attached the secondary coils for BF damper. * Adjusted the weight on the BF. * Adjusted the position of secondary coils. |
|
Line 15: | Line 27: |
* Preparation of the wire for cryo-payload in IYC. * Measurement of dimensions around the IP in Y-end. * Help to OMMT. |
VIS reports for the week ending on 2018/10/26
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[Y-front]
- Removed the secondary coils for BF damper. Opened the cup.
- Removed the old parts to fix the FR blades, then the upper blade was broken (cut off).
- Removed the FR blades.
- Attached the new parts onto the keystone with the new blades.
- Tuned the BF.
- Checked the range of FR. I was 69 +/- 3 mm in the height of keystone.
- Closed the cup. The optimal load was changed. Finally the additional weight for DP was 1.2kg.
- Attached the secondary coils for BF damper.
- Adjusted the weight on the BF.
- Adjusted the position of secondary coils.
Plan for coming weeks
- Preparation of the wire for cryo-payload in IYC.
- Measurement of dimensions around the IP in Y-end.
- Help to OMMT.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Travel Plans
- Travel (Week of 10/29):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 11/5):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/11/2(Fri)