⇤ ← Revision 1 as of 2019-01-11 09:26:04
Size: 1766
Comment:
|
Size: 2074
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
[Y-end] * Calibrated the LVDTs for BF damper. * Started the evacuation of EYV chamber. The IP is touching the stopper. [X-end] * Prepared for the payload extraction. Fixed the BF and pushed down the keystone of TF. * Replaced the yaw FR. |
|
Line 20: | Line 28: |
* Replacement of the yaw FR in X-front on 17-18. |
Agenda/Minutes of the VIS Meeting on 2019/1/11
2019/1/11 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[Y-end]
- Calibrated the LVDTs for BF damper.
- Started the evacuation of EYV chamber. The IP is touching the stopper.
[X-end]
- Prepared for the payload extraction. Fixed the BF and pushed down the keystone of TF.
- Replaced the yaw FR.
Plan for coming weeks
- Replacement of the yaw FR in X-front on 17-18.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Confirmation of the VIS schedule for Jan.
Thesis defence practice
- Kozu-kun and Arai-kun: after the next VIS meeting (12/21)
Travel Plans
- Travel (Week of 1/14):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 1/21):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2019/1/18(Fri)