2019/1/11 13:30 - 2019/1/11 13:30 - 14:50
Line 7: Line 7:
Participants: Participants: Takahashi, Mark, Ishizaki, Sato, Fabian, Aso, Okutomi, Terrence, Enzo, Ohishi, Hirata, Fujii, Lucia
Line 11: Line 11:

Schedule for the site work meeting:

Agenda/Minutes of the VIS Meeting on 2019/1/11

2019/1/11 13:30 - 14:50

Zoom Meeting

Participants: Takahashi, Mark, Ishizaki, Sato, Fabian, Aso, Okutomi, Terrence, Enzo, Ohishi, Hirata, Fujii, Lucia

Progress report

Schedule Chart

Schedule for the site work meeting:

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-C: (XLSX)

Type-A (Takahashi)

Past week report

[Y-end]

  • Calibrated the LVDTs for BF damper.
  • Started the evacuation of EYV chamber. The IP is touching the stopper.

[X-end]

  • Prepared for the payload extraction. Fixed the BF and pushed down the keystone of TF.
  • Replaced the yaw FR.

[X-arm measurement]

  • Measurement campaign with X-arm was conducted.
    • Some stages were excited and then the couplings to the TML etc were measured.
    • Excited dofs were: TML / IML / MNL / IPL / (partly BFL) / BF-GAS / IMV / TMP
    • The purpose was to get the followings:
      • Vibration isolation performance (GND2TML)
      • force transfer functions of TML2TML, IML2TML, MNL2TML
      • couplings of V2L, P2L (somehow I forgot to measure Y2L coupling)
    • Now analysis is ongoing.

Plan for coming weeks

  • Replacement of the yaw FR in X-front on 17-18.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Confirmation of the VIS schedule for Jan.

Thesis defence practice

  • Kozu-kun and Arai-kun: after the next VIS meeting (12/21)

Travel Plans

  • Travel (Week of 1/14):
    • Takahashi: 15-18
    • Okutomi:
    • Sato: 15-18
    • Lucia: 15-18
    • Fabian: 15-18
    • Mark: 15-18
    • Hirata: 15-18
    • Enzo:15-18

    • Shoda:
    • Ohishi:
    • Fujii: 16-18
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 1/21):
    • Takahashi: ??
    • Okutomi:
    • Sato: ??
    • Lucia: 21-25
    • Fabian: 21-25
    • Mark:
    • Hirata: 21-25
    • Enzo: 21-25
    • Shoda:
    • Ohishi:
    • Fujii: 21-25
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2019/1/18(Fri)