Differences between revisions 2 and 3
Revision 2 as of 2019-01-24 18:44:15
Size: 2653
Editor: YoichiAso
Comment:
Revision 3 as of 2019-01-25 09:12:41
Size: 3324
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
[Y-front]
  * Adjusted the tilt of BF arranging the location of ballast masses.
  * Adjusted the yow position of IP. Set the operation point at 5mm from the center in CW.
  * Adjusted the yaw position of BF using the yaw FR in the TF.

[X-front]
  * To improve the motion of yaw FR in the TF, added the coil springs with side bar on the receptacle.
  * The strength to pull back the receptacle was increased, but still not enough.
  * Released the IP. One horizontal FR reached at the limit, it was recovered.
  * Adjusted the position of IP by the jacks and the horizontal FR.

[Y-end]
  * Locked the IP.
Line 22: Line 36:
  * Finalization of yaw FR in X-front (Feb 5-6).

Agenda/Minutes of the VIS Meeting on 2019/1/25

2019/1/25 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Site work schedule: XLSX

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-C: (XLSX)

Type-A (Takahashi)

Past week report

[Y-front]

  • Adjusted the tilt of BF arranging the location of ballast masses.
  • Adjusted the yow position of IP. Set the operation point at 5mm from the center in CW.
  • Adjusted the yaw position of BF using the yaw FR in the TF.

[X-front]

  • To improve the motion of yaw FR in the TF, added the coil springs with side bar on the receptacle.
  • The strength to pull back the receptacle was increased, but still not enough.
  • Released the IP. One horizontal FR reached at the limit, it was recovered.
  • Adjusted the position of IP by the jacks and the horizontal FR.

[Y-end]

  • Locked the IP.

Plan for coming weeks

  • Finalization of yaw FR in X-front (Feb 5-6).

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Updated KAGRA schedule

  • 1/23 BS will be aligned to Y-end PD by IR.
  • 1/24-25 ITMX will be aligned to REFL by IR.
  • 1/24-25 ITMY will be aligned to REFL by IR.

SR2 and SR3 must be ready: 1/26

  • 1/26 Beam position of IR at SR3 will be confirmed how far from the center.
  • 1/28-29 SR3 will be aligned to SR2 center by IR.
  • 1/30 Green beam will be injected from SR2 AR surface to Y end PD.
  • 1/31 Removing bellows at PR and SR area.
  • 1/31-2/1 Cleaning HR of PR3 and AR of SR2

SRM must be ready: 2/4

  • 2/4-8: Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR

  • 2/4-8: Alignment of ETMY -> POS by Green

  • 2/12-13: Close the center area chambers
  • 2/14-15: Center area pump down.

Vacuum monitoring

  • 2/14(Thu)-15(Fri): Center area pump down
  • 2/15(Fri) - 2/16(Sat): ITMX, ITMY, pump down
  • 3/6(Wed)- 3/7(Thu): ETMY pump down
  • 3/21(Thu) - 3/22(Fri): ETMX pump down

Travel Plans

  • Travel (Week of 1/28):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Terrence
  • Travel (Week of 2/4):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Terrence

Next meeting

On 2019/2/1(Fri)