Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
[X-front]
  * Replaced additional springs to pull back the receptacle.
  * Checked the motion of yaw rotation using the stepping motor. It could work.
  * Adjusted the tilt of IP using the jacks.

[X-end]
  * Connected the cryo-payload. Released the BF.

[Y-end]
  * Released the IP. It was unstable. Removed one arc of 19-mm ballast ring.
  * Centered the IP by stepping motors.
  * Measured transfer functions of IPL showed low Q. Removed one more arc of ballast ring. The cabling around IP was corrected.
  * The signal of LVDT for H3 was too small. Adjusted the demodulation phase in the driver.
Line 22: Line 36:
  * Adjustment of the TF, the BF damper, and the IP in X-end (Week of Feb 18).

Agenda/Minutes of the VIS Meeting on 2019/2/8

2019/2/8 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Site work schedule: [[|XLSX]]

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-C: (XLSX)

Type-A (Takahashi)

Past week report

[X-front]

  • Replaced additional springs to pull back the receptacle.
  • Checked the motion of yaw rotation using the stepping motor. It could work.
  • Adjusted the tilt of IP using the jacks.

[X-end]

  • Connected the cryo-payload. Released the BF.

[Y-end]

  • Released the IP. It was unstable. Removed one arc of 19-mm ballast ring.
  • Centered the IP by stepping motors.
  • Measured transfer functions of IPL showed low Q. Removed one more arc of ballast ring. The cabling around IP was corrected.
  • The signal of LVDT for H3 was too small. Adjusted the demodulation phase in the driver.

Plan for coming weeks

  • Adjustment of the TF, the BF damper, and the IP in X-end (Week of Feb 18).

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Travel Plans

  • Travel (Week of 2/11):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Terrence
  • Travel (Week of 2/18):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Terrence