Agenda/Minutes of the VIS Meeting on 2019/3/22
2019/3/22 13:30 -
Participants:
Progress report
Schedule Chart
Site work schedule: [[|XLSX]]
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[X-end]
- Checked the BF. The chambers were closed completely.
[Y-end]
- Recovered the coil driver for IP.
- The channel of stepping motor driver for IP-H1 was broken. Changed the assignment of channel from "motor1" to "motor5".
- Adjusted the IP position to the initial one.
[Y-front]
- Assembled the cable for Pt100.
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- The offsets for PRM-IM in P/Y in order to damp the main beam was confirmed with help of IOO team and Fabian, and they were (P, Y) = (-8000, -9500).
- Satellite boxes for PR2 and PRM are not yet replaced with the new ones.
- The LVDT board for BF-LVDT-V is not yet replaced/tuned.
- Somehow the PR2-IM was drifted largely in Yaw. Pulling back with the BF-pico will work though, we will want to check if the RM is still free from the frame maybe.
Plan for coming weeks
- Replace the Satellite boxes for PR2 and PRM with the new ones.
- Replace/tune the LVDT board for BF-LVDT-V.
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Travel Plans
- Travel (Week of 3/25):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Terrence
- Travel (Week of 4/1):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Fujii:
- Tanioka:
- Terrence
Next meeting
On 2019/3/29(Fri)