Agenda/Minutes of the VIS Meeting on 2019/3/29

2019/3/29 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Site work schedule: [[|XLSX]]

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-C: (XLSX)

Type-A (Takahashi)

Past week report

[Y-end]

  • Checked the connectors on the BF. Cable trouble was recovered without doing anything. The cable has been damaged ever in the installation work (2017).
  • The F0 was not working.

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Travel Plans

  • Travel (Week of 4/1):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Terrence
  • Travel (Week of 4/8):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Terrence

Next meeting

On 2019/4/5(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190329 (last edited 2019-03-29 20:15:23 by RyutaroTakahashi)