Agenda/Minutes of the VIS Meeting on 2019/6/7

2019/6/7 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule

Site work schedule: [[|XLSX]]

Type-A (Takahashi)

Past week report

[Fujii with Yamada-kun, Ushiba-san]

Plan for coming weeks

Type B (Mark)

Report for the week 6/3

SRM Inertial Damping and Residual Motion Stuff

RMS Displacement:

Requirement

Result

L

0.4 µm

0.1076 µm

P

1 µrad

0.0569 µrad

Y

1 µrad

0.0598 µrad

RMS Velocity:

Requirement

Result

L

0.5 µm

0.1014 µm/s

P

/

0.2165 µrad/s

Y

/

0.1776 µrad/s

SR3 Inertial Damping

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

=== OMMT & OSTM (Takahashi)===

Past week report

[Sato]

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

Discussion

Travel Plans

Next meeting

On 2019/6/14(Fri)