Differences between revisions 5 and 6
Revision 5 as of 2019-07-19 11:23:34
Size: 2316
Editor: AyakaShoda
Comment:
Revision 6 as of 2019-07-19 11:24:49
Size: 2340
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 47: Line 47:
      TypeAtower: /users/VISsvn/TypeAtower/scripts

      TypeApayload: /users/VISsvn/TypeApayload/scripts

      TypeB: /kagra/Dropbox/Subsystems/VIS/TypeBData/scripts
      TypeAtower: /users/VISsvn/TypeAtower/scripts<<BR>>
      TypeApayload: /users/VISsvn/TypeApayload/scripts<<BR>>
      TypeB: /kagra/Dropbox/Subsystems/VIS/TypeBData/scripts<<BR>>
Line 55: Line 52:
      TypeAtower: /users/VISsvn/TypeAtower/(OPTIC)/Measurements/TF/Measurements/

      TypeApayload: /users/VISsvn/TypeApayload/(OPTIC)/TF/Measurements/

      TypeB: /kagra/Dropbox/Subsystems/VIS/TypeBData/(OPTIC)/TF/Measurements/
      TypeAtower: /users/VISsvn/TypeAtower/(OPTIC)/Measurements/TF/Measurements/<<BR>>
      TypeApayload: /users/VISsvn/TypeApayload/(OPTIC)/TF/Measurements/<<BR>>
      TypeB: /kagra/Dropbox/Subsystems/VIS/TypeBData/(OPTIC)/TF/Measurements/<<BR>>

Agenda/Minutes of the VIS Meeting on 2019/7/19

2019/7/19 13:30 -

Zoom Meeting

Participants:

Progress report

Type-A

Past week report

  • Modified the HPCD for the ETMY TM to increase the current limit from 40 mA to 120 mA, limited by the hardware watchdog.
  • The commissioning team was working on the damping filter for ETMY, the guardian for ETMX, and the DC control path.

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

  • BFH output: klog

  • Working on updating noise-budgeting tool.

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Checked the stock of OSEMs. 9 of 17 OSEMs are available, but evaluation is necessary.
  • Confirmed some dimensions on the present OSTM. The height of the breadboards was consistent with the design one. 10mm spacer is necessary.
  • Ordered the modification parts for the mirror gluing jig and the standoffs.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • Data management
    • The directory structure of the auto-measurement is different between each types of suspensions.
      • Script files
        • TypeAtower: /users/VISsvn/TypeAtower/scripts
          TypeApayload: /users/VISsvn/TypeApayload/scripts
          TypeB: /kagra/Dropbox/Subsystems/VIS/TypeBData/scripts
          TypeBp: /users/VISsvn/TypeBp/scripts

      • Measured files
        • TypeAtower: /users/VISsvn/TypeAtower/(OPTIC)/Measurements/TF/Measurements/
          TypeApayload: /users/VISsvn/TypeApayload/(OPTIC)/TF/Measurements/
          TypeB: /kagra/Dropbox/Subsystems/VIS/TypeBData/(OPTIC)/TF/Measurements/
          TypeBp: /users/VISsvn/TypeBp/(OPTIC)/TF/Measurements/

Travel Plans

  • Travel (Week of 7/22):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
    • Terrence:
  • Travel (Week of 7/29):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting