Agenda/Minutes of the VIS Meeting on 2019/8/30

2019/8/30 14:00 -

Zoom Meeting

Participants:

Progress report

Type-A

Past week report

  • general
    • performance test of the inertial damping was done with ETMX and ITMX.
      • This will be summarized by Lucia.
    • The simulation model for type-A suspension is now being modified from https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/VIS/SuspensionControlModel/script/TypeA/typeA_siso180517.m

      • Originally for my own use though.
      • Some channels and sensor correction paths are added.
      • Some of the filter name was corrected.
      • The updated one is in my local , is to be uploaded to SVN after renaming, adding some paths, if necessary:
        • /kagra/Dropbox/Personal/Fujii/TypeA/simulation/
  • At ETMX
    • trying to tune the sensor-correction gain. Still Ongoing.local note

  • At ITMY
    • A work introducing payload damping filters is started, this work is mainly taken care by Yamada-kun.
  • ITMX
    • Attempts of WFS control demonstration with TM OpLev is ongoing.

      • Beside that, some missing damping filters were implemented as needed.
    • 46.6 Hz peak investigation
      • Promising mode: a higher-order mode of TM chain in pitch klog#10204

      • On the way of damping with a band-pass comb filter
  • Updated the list of the modification parts in the 3D CAD model.

Plan for coming weeks

  • Join to the test of WFS.

Type B

Report for the week 26-08-2019

  • Shoda-san improved the SR3 optic pitch filter (klog 10152, 10217).

  • For the SR3 optic Enomoto-kun implemented an integrator filter with UGF above the micro-seismic (klog 10014). This filter used the oplve signal.

    • It works well, but it requires a set-point, which is currently set at the IM level (for IM DC control) not at the optic level.
    • A clear and clean implementation requires moving the set-point to the optic level and then take the error signal to the IM.
  • Nakano-kun modified the SR2 optic set-point to a place which is not so suitable for the oplev. We will move the QPD on Monday.
  • I modified the SR2 tower real-time model to allow for LVDT correction and feedforward with seismometer.
    • I had to modify the PEM real-time model to connect the seismometer channels to the Dolphin network.
    • Both models compile and I'm currently modifying the medm screen.
  • Performance report
    • There was a typhoon before the F2F meeting and this week we have had bad weather, in both cases there was an increase of the micro-sesmic activity.
    • During the typoon we saw a large peak at 150 mHz and this week we saw a peak a large peak at 60 mHz.
    • With bad weather Type B suspensions' optic motion (upper limit) were above the requirement in TM-L displacement and velocity: BS 10046, SR2 10052, SR3 10056, SRM 10067.

    • Nevertheless, in days with good weather the suspensions behave mostly well in ALGNED and FLOAT states: BS 9697, SR2 9703, SR3 9702, SRM 9704.

    • I also found the vertical ground motion induces motion in TM-Y and TM-P, but even with bad weather the motion remain below the requirement.
  • With this bad weather I was able to measure transfer functions from the ground to (klog 10170).

Plan for the week 02-09-2019

  • On Monday I will work with Yokozawa-san putting accelerometers on the SR3 oplev platforms. We will likely turn the fans off to do measurements.
  • We will move the SR2 tilt oplev QPD.
  • Real-time model: move the optic set-point to the optic level.
  • Update medm screens.
  • Shoda-san reported a coil-driver not working properly with the binary input/output. I need to check.
  • Test Shoda-san's fisnhing rod off-loading script with SRM sometime next week.
  • Terrence will be back on Wednesday.

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Dummy mirror was delivered.
  • Ordered the spacer plate and the connector plate.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

VIS repair/upgrade work between O3 and O4

  • The list is required by the SEO. They need it for scheduling and arrangement of the site works between O3 and O4 considering the task of all subsystem.
    • One more week was added to the period for EYV work.
    • Recovering of the FRs includes the adjustment of ballast masses. Though needed period depends on the situation, two more weeks were added for each SR3/BS work.
    • Installation of the yaw FR for BS includes the replacement of bearing.
    • The re-gluing of the IM/TM magnets was omitted.
    • Replacement of the ferromagnetic parts on SF in BS/SR3 was added.
    • Expenses will be covered by the 2019FY budget. Spare connectors are included in the budget.
  • Optional
    • Improvement of the FRs with limiter switch.
    • Improvement of the ACCs.
    • Connector supports for the assembled in-vac cables.
    • Replacement of the LVDT cards.
    • Replacement of the LVDT-actuator units in BS.
  • Small items
    • Tuning of BS IP by small ballast.
    • Flip connections in BS IP H2 coil actuator.
    • Replacement of the chipped magnets (12x12x12 mm) for IP in SR3
    • Moving of the electronics to small rack in SR3.
  • List for SEO

  • Brain storming page

Comments from the site workers

  • It seemed that the proposed schedule did not include the integration period (a period after the hardware installation, before starting the interferometer work, i.e., suspension commissioning work YF guess).
  • It would be better to have a slot to consider the feasibility and robustness of the schedule so on, more seriously, with VIS folks.

Travel Plans

  • Travel (Week of 9/2):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 9/9):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/9/6(Fri)