Differences between revisions 2 and 3
Revision 2 as of 2019-08-30 09:17:01
Size: 1189
Comment:
Revision 3 as of 2019-08-30 09:19:24
Size: 1255
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
=== OMMT & OSTM === === OMMT & OSTM (Takahashi) ===
Line 24: Line 24:
 * Ordered the spacer plate and the connector plate.

Agenda/Minutes of the VIS Meeting on 2019/8/30

2019/8/30 14:00 -

Zoom Meeting

Participants:

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Ordered the spacer plate and the connector plate.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 9/2):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 9/9):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/9/6(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190830 (last edited 2019-09-02 10:01:32 by RyutaroTakahashi)